1 / 7

Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders

Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders. Conclusions and next steps Luc Aliadière, UIC. UIC, Paris 25.10.2005. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders.

duane
Download Presentation

Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions and next steps Luc Aliadière, UIC UIC, Paris 25.10.2005

  2. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions: Context • European transport policy • Sustainable transport: favours rail transport • Environmentally sound rail transportation requires noise control • Environmental Noise Directive • Noise maps 2006, Action plans 2007 • A business case for the railways UIC, Paris 25.10.2005

  3. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions:State of the Art • Technology for quiet rail vehicles available • K-blocks homologised • LL-blocks in operational tests • Retrofitting has best cost-benefit ratio • Higher effectiveness than noise barriers • Overall costs can be determined • Operational experience favourable • Railway noise less annoying than road traffic • Can be solved with rolling stock improvement UIC, Paris 25.10.2005

  4. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions: Funding/Financing • Retrofitting requires initial investment • Outside help necessary • EU: likely only for new member states • Subsidy by member states: requires State Aid guidelines • Investment shift from infrastructure to rolling stock • Can reduce overall costs by factors UIC, Paris 25.10.2005

  5. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Next steps • Member states, regions: • Clarify subsidies • Include retrofitting in action plans • EU: • State Aid guidelines • Clarify funding possibilities • UIC, Railways: • Technical optimisation • Organise network • Detailed costs per country by the end of the year UIC, Paris 25.10.2005

  6. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Next steps • Next Workshops: • - Autumn 2006 • - Autumn 2007 • Assistance for local events or action plans: • - Contact UIC if participation by UIC Action • Programme members is beneficial • (orsini@uic.asso.fr) UIC, Paris 25.10.2005

  7. Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Closing coffee & networking Thank you for your participation and have a safe trip home! UIC, Paris 25.10.2005

More Related