An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Issues Review Presented By: Michael Mayhill

  2. Technical Issues Review • Composite Blades • Aluminum Blades • Hubs • Seals • Spinner • De-ice • Miscellaneous • Status Updates

  3. Your Input Appreciated • Some of our best fixes have been suggested by the field • You see these products in normal and extreme conditions every day – • What do you see that is working? • What do you see that is not working? • Do you have suggestions to make something better?

  4. Composite BladesASC II • As of September 24th there were 4087 of the composite N7605( ) blades manufactured • These blades are becoming more and more popular with your customers • We are working to develop new applications • More are manufactured every day

  5. Composite BladesASC II • HC-SL-61-294: • Field Inspection and Minor Repair Criteria for N7605( ) blades [May 07/09] • Previously in Manual 135F only

  6. Composite BladesASC II • HC-SL-61-294: • Defines permitted field repairs for A&P mechanics • Damage beyond minor repair limitations must go to a certified propeller service facility

  7. Composite BladesInspection • HC-ASB-61-306 rev. 2: • N7605B blade ‘crack’ indication in boot area • Evaluation found ‘soft spot’ at the ‘crack’ location • Resin did not properly cure during early production process

  8. Composite BladesInspection • HC-ASB-61-306 rev. 2: • Inspections of N7605( ) • Effectivity is s/n specific to early production • 387 blades affected

  9. Composite BladesInspection • HC-ASB-61-306 rev. 2: • Visual Inspection: • Recurring visual inspection every 100 hrs/annual • Reporting required • A&P can accomplish • Warranty coverage for visual

  10. Composite BladesInspection • HC-ASB-61-306 rev. 2: Inspection of N7605( ) • Terminating Action UT Inspection at or before overhaul • Reporting required • Accomplished by Level II or III • 52 inspections completed, 6 blades replaced

  11. Composite BladesInspection

  12. Composite BladesInspection

  13. Composite BladesInspection • HC-ASB-61-306 rev. 2: Inspection of N7605( ) • UT equipment available for loan • Warranty coverage for UT at overhaul

  14. Composite BladesStaking Pins • Staking pins found sheared during standard engineering evaluation of high-time N7605( )blade • No performance issues noted • Design improvement with larger staking pins

  15. Composite BladesStaking Pins • HC-SB-61-319: Staking Pins [pending] • Affects N7605( ) and N7893( ) blades by s/n • 3658 blades • Terminating Action at overhaul • Index to new location • Insert new, larger pins • Does not affect life of product

  16. Composite BladesStaking Pins Was B-5996-628 Ø=0.125” Now B-5996-640 Ø=0.1875” (Production)

  17. Aluminum BladesProduction Rolling Issue • HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10] • Internal production process issue • M, P, and R shank blades from Jul 09 – Jan 10 • Cost analysis led to engineering review • Reduced minimums approved • Manual update pending

  18. Aluminum BladesProduction Rolling Issue • HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10] • M, P, and R shank blades by s/n • K85813 – K97065 • Optical Comparator Inspection • Factory only rework

  19. Aluminum BladesProduction Rolling Issue • HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10] • Reworked and non-reworked may be mixed in a propeller assembly if balance can be achieved • No loss of clamping force due to clamp design

  20. Aluminum BladesNaCl Contamination • HC-ASB-61-322: Blade Replacement [pending] • Fissure indication in the blade bore discovered at overhaul inspection • Originated from Sodium Chloride contamination within the ingot • Potentially all blades forged from that ingot could be contaminated

  21. Aluminum BladesNaCl Contamination • HC-ASB-61-322: Blade Replacement [pending] • Affects Y-shank aluminum blades by serial number • 452 blades affected • 82 left Hartzell as blade only shipment We are Considering: • Replacement within 250 hours/ 24 calendar months, whichever occurs first • Any inventory/stock replacement within 24 calendar months

  22. Aluminum BladesNaCl Contamination • HC-ASB-61-322: Blade Replacement [pending] • Affected blades MUST be retired and destroyed • Airworthiness Directive is possible • Warranty: • Replacement Blades free of charge until Nov 30, 2016 • Some additional coverage for props maintained IAW SL61Y

  23. HubsLubrication Fittings • HC-SL-61-187 rev. 3: 45˚ Lubrication Fitting [Nov 13/09] • Originally issued Oct 15/98 • Revision 3 removed torque • “Tighten until snug” • Any issues with the zerk fittings?

  24. HubsModification • HC-SI-61-206: Hub Modification – Bore Bushing • Dimensional specifications for machining of bore and bushing on lightweight turbine propellers • Available on request • Revision needed for additional part numbers • Pending Changes related to Sample Program review

  25. Hubs1900D Inspection • HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09] • Two 1900D hubs found fractured near dowel holes and oversize inserts on mounting flange • Found at overhaul inspection

  26. Hubs1900D Inspection • HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09] • ~800 hubs affected • Initial visual inspection based on TSO • As required following visual: • ECI • Stamp hub “K” • REPORTING REQUIRED

  27. Hubs1900D Inspection • HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09] • 273 inspected • No indications • Recurring ECI every 1000 hrs • REPORTING REQUIRED • ECI required at each overhaul • REPORTING REQUIRED

  28. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Compact -1 propeller on a Beechcraft Bonanza stopped actuating in flight • Investigation found failed bore bushing with oil behind the piston • Hydraulic lock

  29. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Failure to seal due to: • No bushing • Scored bore / damaged o-ring • Bushing installed with adhesive • Failed adhesive • Bushing Slippage

  30. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Propeller operates, doesn’t actuate • Defaults to low pitch, high RPM • Operates as fixed pitch propeller

  31. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Bonanza pilot set up for POH ‘Best Glide’ • Not compatible with low pitch, high RPM setting for Bonanza • FAA SAIB-CE-10-21 issued to notify pilots

  32. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Compliance required for any Bonanza or Debonair w/ ( )HC-(C,G,L)(2,3,4)Y(F,K,R)-1( ) • Propellers NOT maintained IAW SL61Y: 200 hrs, 12 calendar months, or next major disassembly, whichever occurs first • Propellers maintained IAW SL61Y:next major disassembly or SL61Y overhaul limit, whichever occurs first

  33. HubsBonanza/Debonair Bushing • HC-SB-61-315: Hub Bore Bushing [pending] • Serial number prefix identifies affected hubs • Perform applicable pitch change rod bore repair procedure IAW Manual 202A

  34. HubsProduction Bushing (-1) • HC-SL-61-305 [pending] • Production change for all standard -1 hubs • Does not match 202A repair • Replace bushing at overhaul • No machining required

  35. HubsProduction Bushing (-1) • HC-SL-61-305 [pending] • Production change for all standard -1 hubs • Already implemented in 113B for all Bonanza specific item # • SL305 addresses all remaining standard -1 hubs

  36. HubsTB-10 Inspection • HC-SB-61-323: Hub Inspection [pending] • Affects propellers installed on Socata TB-10 • ECI of “A” suffix hubs, similar to SB269 • Initial within 50 hours • Recurring every 100 hours or annual • Terminating actions: • Hub Replacement with “B” suffix hub • Oil fill IAW SL273 [pending]

  37. Hubs Oil-Fill • HC-SL-61-273: Hub Modification [pending] • ~4500 hrs in field • Only when directed by Hartzell Service Bulletin • Machine hub bore & breather holes • Install bushing & retainer ring

  38. Hubs Oil-Fill • HC-SL-61-273: Hub Modification [pending] • Only when directed by Hartzell Service Bulletin • New sealant at parting line • Plugs instead of zerks • Red-dyed oil-filled for crack detection

  39. SealsGrease Leaks • Silicone O-rings • Grease leaks have been a concern in aluminum hub propellers • Suggestion from the field for use of new material • Engineering analysis for compatibility completed

  40. SealsGrease Leaks • Silicone O-rings • Field testing in alum models ongoing • Over 30,000 SER hours with NO leaks • Already implemented in production for many models • Successful seal is also dependent upon a good installation of the appropriate wear strip

  41. SealsGrease Leaks • HC-SL-61-293 rev. 1: Y Shank Aluminum Blades [Mar 12/10] • Introduces C-3317-340-8 • Approved alternate to quad seal • Requires use of 0.010” Teflon® • Cost analysis in process for production implementation

  42. SealsGrease Leaks • HC-SL-61-301: • Supersedes all C-3317-340 [Mar 12/10] • Introduces C-3317-340-8 • Requires use of 0.010” Teflon® on alum blades • Use existing C-3317-340 • Composite blades use different wear strip • No change required • Production implemented

  43. SealsGrease Leaks • HC-SL-61-303: Supersedure in 1900D Installations [Apr 9/10] • Introduces C-3317-340-8 • May use existing energizer ring + blade seal in combination

  44. SealsGrease Leaks • HC-SL-61-303: Supersedure in 1900D Installations [Apr 9/10] • Energizer ring + blade seal can not be mixed with C-3317-340-8 in same propeller assembly • Production and overhaul kit implementation is complete

  45. SealsGrease Leaks • HC-SB-61-321: Replacement in PC-21 Installations [Jun 15/10] • Introduces C-3317-341-8 and 103379-1 wear strip • Required at next o/h • Optional at disassembly • Requires use of thicker 103379-1 wear strip

  46. SealsGrease Leaks • HC-SB-61-321: Replacement in PC-21 Installations [Jun 15/10] • Energizer ring + blade seal combination can not be mixed with C-3317-341-8 in same propeller assembly • Reporting required • Production and o/h kit implementation complete

  47. SealsGrease Leaks • HD-SL-61-042: • Supersedure for Do-328 Installations [pending] • Introduces C-3317-341-8 and 103379-1 wear strip • Requires use of thicker 103379-1 wear strip

  48. SealsGrease Leaks • HD-SL-61-042: • Supersedure for Do-328 Installations [pending] • Energizer ring + blade seal combination can not be mixed with C-3317-341-8 in same propeller assembly

  49. Spinner • Known cracking issues • Working to design a permanent fix by application

  50. Spinner835-54(P) Replacement • HC-SB-61-311: Inspection of 835-54(P) Spinner Assembly & Introduction of New Spinner Assemblies • Progression of document • Original Issue: • D-5769-1(P) dome, filler plate removal required