1 / 16

Aleutian Islands –Alaska Emergency Towing Systems

Aleutian Islands –Alaska Emergency Towing Systems . September 1, 2009 AIRA Advisory Panel Meeting Unalaska, Alaska. Selendang Ayu. Background. 2007 Near grounding M/V Salico Frigo (March) Mayor of Unalaska convened a Workgroup Develop emergency towing capability locally

duena
Download Presentation

Aleutian Islands –Alaska Emergency Towing Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aleutian Islands –Alaska Emergency Towing Systems September 1, 2009 AIRA Advisory Panel Meeting Unalaska, Alaska

  2. Selendang Ayu

  3. Background • 2007 Near grounding M/V Salico Frigo (March) • Mayor of Unalaska convened a Workgroup • Develop emergency towing capability locally • Purchase of equipment • Development of Procedures Manual • Training Video • Annual Training & Equipment Inspection

  4. Aleutians Shipping Route - Unimak Pass

  5. Vessel Traffic Statistics • 4,470 large commercial vessel transits through Unimak Passin 2007: – 3,580 vessels westbound (85%) – 890 vessels eastbound (15%) – 3,130 vessels bound to/from U.S. ports (70%) – 1,340 vessels bound to/from Canadian ports (30%) • Number of transits of vessels involved in local trade tracked in and around Unimak Pass in fiscal year 2007: 1,720 (1,435 fishing vessels , or 80 percent of the total)

  6. Emergency Towing System Components

  7. 600’ x 7/8” Spectra Messenger Line Lighted Pick-up & Thimble Buoy Line Gun Components

  8. Ship’s End Tug’s End 500’ by 7” Plasma Towing Line

  9. Packing

  10. Deployment

  11. Ship to Tug

  12. Stage VII - Ship to Tug Deployment Ship to Tug

  13. Ship Hauling

  14. Tug to Ship Deployment

  15. ETS Training & System Expansion • May 2008- IMO Regulation Revision require all ships to carry emergency towing procedures, towing arrangement, equipment inventory, means of communicating • August 2008 Aleutian ETS Training • Update Procedures Manual • Tandem Tow Tactic • October 2008- ETS System staged in Kodiak • September 2009 Aleutian ETS Training

  16. Questions?