An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC cost drivers Philippe Lebrun on behalf of theC&S WG CLIC Technical Committee 3 November 2009

  2. CLIC Cost & Schedule WGMandate April 2009 • Establish and optimize the cost of the CLIC complexat the nominal collidingbeamenergy of 3 TeV, as well as that of an optional first phase with a collidingbeamenergy of 500 GeV • Define and optimize the generalschedule for the 3 TeV and 500GeVprojectsdefinedabove • Estimate the electrical power consumption of the 3 TeV and 500 GeVprojectsdefinedabove • Identify possible modifications of parameters and/or equipmentleading to substantial capital and/or operationalcostsavings, in order to define best compromise between performance and cost • Developcollaboration with ILCproject on costestimatemethodology and cost of common or comparable systems, aimingatmutualtransparency • Document the process and conclusions in the CDR in 2010 Ph. Lebrun – CTC 091103

  3. CLIC Cost & Schedule WGActivities 2009 April 2009 • Establish responsibilities, procedures & workpackages in cost assessment • Reception specified costing tool, including currency conversion & price escalation procedures, and start applying it • Identify domains of analytical costing and perform estimates • Identify cost drivers and areas of potential cost reduction • Conduct first round of analytical costing of CLIC 3TeV • Establish proper technical/cost scaling of CLIC 500 GeV • Refine general schedule and derive manufacturing/reception testing/installation constraints • Update estimates of power & energy consumption, including part-load operation • Collaborate with ILC on previously defined cost topics • Cost risk analysis • Cost of normal conducting magnets Ph. Lebrun – CTC 091103

  4. Analytical costing based on PBS Component level Coordinators per domain/subdomain Identified for analytical costing based on level 5 description List of systems standardized Contact experts per system Ph. Lebrun – CTC 091103

  5. Status of analytical cost estimates • CLIC Study Costing Tool • Operational • Based on PBS for CLIC 3 TeV and 500 GeV, as defined by TC for the CDR ⇒ analytical cost upload just started • Questionnaire sent to Domain/Subdomain Coordinators (3 August 2009) • Preparation of analytical cost estimate review • Identification of cost drivers, risks and reduction issues ⇒ one received so far! • Presentations at C&S WG meetings • 24 September 2009: Main beam production - damping rings (Y. Papaphilippou) • 29 October 2009: Drive beam production (B. Jeanneret), Two-beam accelerator modules (G. Riddone) • 5 November 2009: Infrastructure & services (J. Osborne) • 26 November 2009: Main beam production - injectors & beam transport (L. Rinolfi), [Interaction region (L. Gatignon)] ⇒ work in progress ⇒ technical definition for analytical costing not available for all domains/subdomains Ph. Lebrun – CTC 091103

  6. CLIC 3 TeV cost estimate 2007 (H. Braun & G. Riddone) Indirect impact Direct Main linacs are the cost drivers • The main linacsaccount for a large fraction of CLIC cost, and impact strongly on other capital (tunnel, infrastructure, services) and operation (electricity, cooling, maintenance) costs • Veryhigh, unprecedentedmultiplicity of components, willrequirenovel solutions for manufacturing, installation, maintenance, reliabilityassessment CLIC 3 TeV (per linac) Modules: 10462 Accelerating str.: 71406 PETS: 35703 MB quadrupoles: 1996 DB quadrupoles: 20924 CLIC 500 GeV (per linac) Modules: 2124 Accelerating str.: 13156 PETS: 6578 MB quadrupoles: 929 DB quadrupoles: 4248 Ph. Lebrun – CTC 091103

  7. Automatic chains AS discs AS quadrants CLIC AS CLIC PETS CLIC Quads CLIC TBM Flexible workshops Flexible cells, manual work CLIC vs LHC series components Ph. Lebrun – CTC 091103

  8. Cost drivers & potential saving options Main and drive beam production Cost impact L Order of 10 MCHF M Order of 100 MCHF H Order of 1 BCHF C&S WG review not completed! Ph. Lebrun – CTC 091103

  9. Cost drivers & potential saving optionsTwo-beam modules [1/2] Cost impact L Order of 10 MCHF M Order of 100 MCHF H Order of 1 BCHF Ph. Lebrun – CTC 091103

  10. Cost drivers & potential saving optionsTwo-beam modules [2/2] Cost impact L Order of 10 MCHF M Order of 100 MCHF H Order of 1 BCHF Ph. Lebrun – CTC 091103

  11. Cost drivers & potential saving options Interaction regions Cost impact L Order of 10 MCHF M Order of 100 MCHF H Order of 1 BCHF C&S WG review not completed! Ph. Lebrun – CTC 091103

  12. Cost drivers & potential saving options Infrastructure and services Cost impact L Order of 10 MCHF M Order of 100 MCHF H Order of 1 BCHF C&S WG review not completed! Ph. Lebrun – CTC 091103

  13. Summary • Costconsciousnesswellestablished in CLIC technicalworking groups (Module, RF structures, CES,…) • Somecost drivers and costreduction areas identified - as well as theirinterplay - analysis not yet exhaustive • Costscalingmodelsonlyexist for limitednumber of components or subsystems • Analyticalcostingexerciseunderway by domaincoordinatorswith input fromtechnical system experts, in domainswheretechnicalbaselineexists • Technicalbaseline to bedefined in otherdomains • Significantdifferencesobserved w r to 2007 costestimate • Feedback provided to technical system design • Targetedcoststudies by industrialcompaniesconsidered, in particular for large-series components • Reliability/availabilityassessment to beconducted (TC?) for system design and possible cost impact Ph. Lebrun – CTC 091103