1 / 15

N EW BRIDGES Project Workshop Kaunas 8.-9. June 2010

Project Workshop, Ka unas 8.-9. June 2010. N EW BRIDGES Project Workshop Kaunas 8.-9. June 2010. Kaunas District Municipality, Kaunas . Decision process. There were three main events after witch was generated the main Pilot Action:. Project Workshop, Ka unas 8.-9. June 2010.

dunn
Download Presentation

N EW BRIDGES Project Workshop Kaunas 8.-9. June 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Workshop, Kaunas 8.-9. June 2010 NEW BRIDGES Project WorkshopKaunas 8.-9. June 2010 Kaunas District Municipality, Kaunas

  2. Decision process • There were three main events after witch was generated the main Pilot Action:

  3. Project Workshop, Kaunas 8.-9. June 2010 1st Information Meeting on the 2nd of July 2009 • 10 priority challenges were identified in Kaunas city-region: • 1. Public transport system – city-region based(Mobility ) • 2. Eco-transport development(Mobility) • 3. Commuting(Mobility) • 4. Authentic rural environmental style is reserved within the city development(Residential preferences ) • 5. Cultural development for the communities in the city and district(Residential preferences ) • 6. Visual and safety improvements of the local residencies(Residential preferences) • 7. Influence of the Elders strengthening(Residential preferences) • 8. The main social/public utilities services in Kaunas district(Provision of services) • 9. Promotion of traditional activities/businesses in Kaunas district(Provision of services) • 10. Development/strengthening of joint recreational services in Kaunas district(Provision of services )

  4. Project Workshop, Kaunas 8.-9. June 2010 1st Local Stakeholder Meeting on the 25th of February 2010 • Priority challenges identified: • Public transport; • Cycling paths; • Urban-rural residents’ opinions research on communication.

  5. Project Workshop, Kaunas 8.-9. June 2010 • Identified Pilot Action 2nd Local Stakeholder Meetingon the 12th of May 2010

  6. Project Workshop, Kaunas 8.-9. June 2010 Stakeholders were: • Kaunas district municipality; • Kaunas city municipality; • LocalCommunity members; • Interest Groups/NGO

  7. Project Workshop, Kaunas 8.-9. June 2010 Analysis of the Individual preferences showed need for: • Urban-rural cooperation based transport system; • eco-transport development; • development/strengthening of joint recreational services in Kaunas district.

  8. Project Workshop, Kaunas 8.-9. June 2010 Main discussedissues • Quality of public transport services’ improvement • Need for creating joint urban-rural public transport communication system • Need for creating cycling paths system in Kaunas district. • Uniting urban-rural cycling paths to one system, creating various services possibilities alongside the cycling paths. • Promoting cycling paths as a way to communicate, to use eco-transport mean and to practice healthy life style, economically wise communication mean.

  9. Project Workshop, Kaunas 8.-9. June 2010 • common urban and rural transportation system; • development of alternative transport. Main needs:

  10. Development ofSustainable Transport

  11. Project Workshop, Kaunas 8.-9. June 2010 Development ofSustainable Transport • Describtion:Creating Cycling paths network scheme uniting urban and rural areas directly connecting it to the Public transports’ scheme. • Main aims:Creating Cycling paths network scheme uniting urban and rural areas directly connecting it to the Public transports’ scheme ensuring servicequality and accessibility. • Foreseeing concrete places for terminals where urban-rural area merge. • Permanent cooperation between City and District municipalities coordinating common public transport work, traffic, taxes etc. • Geographical scope: Kaunas city and Kaunas district

  12. Project Workshop, Kaunas 8.-9. June 2010 Development ofSustainable Transport • Institutions and stakeholders to be involved: • Kaunas district Municipality • Kaunas city Municipality

  13. Project Workshop, Kaunas 8.-9. June 2010 Main implementation steps (timeframe): • Creation of Work group; • City’s and district’s agreement on common management of public transport; • Analyzing good practice; • Creation of terminals’ strategy; • Coordination possible cycling paths scheme, with the surrounding municipalities’ cycling paths; • Creation of cycling paths scheme; • Following guidelines for the implementation.

  14. Possible risk : • Elections to Local Municipalities • 20th of February 2010

  15. Project Workshop, Kaunas 8.-9. June 2010 Thank you for your attention!Feedback and comments are very welcome! Kaunas District Municipality

More Related