130 likes | 140 Views
This report provides a summary of the performance of the Global Climate Observing System (GCOS) networks GSN and GUAN, as well as the ongoing GCOS Cooperation Mechanism (GCM) projects. Key points from the meeting document highlight network performance, GCM projects, and key points for ICT-IOS GSN and GUAN networks. Updates on network station lists and the 2016 GCOS Implementation Plan are also included.
E N D
Global Climate Observing System GCOS Networks (GSN & GUAN) GCOS Cooperation Mechanism (GCM) CBS Lead-Centres - GCOS (Report – ICT-IOS, Geneva : Doc 4.2) 18th April 2016 Tim Oakley, GCOS Network Manager
Outline ( Key points from meeting document) • Network Performance • GCM Projects • Key points for ICT-IOS
GUAN Performance 2015 (2011 – 14) - NCEP Minimum requirement of 25 daily soundings each month to at least 30hPa.
Lead Centres Bi-annual meeting of CBS-LC-GCOS Last meeting – Oct 2013 (Santiago, Chile) Next meeting – Sept 2016 (Cambridge, UK) (Proposed)