Artificial Lift Utilizing CT as a Hollow Sucker Rod

Artificial Lift Utilizing CT as a Hollow Sucker Rod. Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC. Stekoll Slimhole Pumping System (1960). 1” Tee. Rubber Hose. Clamp. Flow Line. Conventional Stuffing Box. Polished Rod Liner. Gas Vent.

dustin
Download Presentation

Artificial Lift Utilizing CT as a Hollow Sucker Rod

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Artificial Lift UtilizingCT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.

  2. Stekoll Slimhole Pumping System (1960) 1” Tee Rubber Hose Clamp Flow Line Conventional Stuffing Box Polished Rod Liner Gas Vent 2 7/8” Casing 1” EUE Pumping String Blind Cage Traveling Barrel Insert Pump Slip-Type Hold-Down with Rubber Removed Screen

  3. Stekoll Field Well (1960)

  4. STEKOLL Field Experience (1960) • Over 1,000 Wells • 3,000 to 5,000 Foot Wells • 1” EUE Tubing (Hollow Sucker Rod) • 2-1/2” & 2-7/8” Inch Casing • 70 BOPD • 40 to 50% Reduction in Tubular Costs • 17% Overall Cost Savings

  5. STEKOLL Slimhole Wells (1960) • Bolton Field, Kansas (1,000 ft) - 1,000 Wells • Corsicana, Texas (1,200 ft) - 300 Wells • Panhandle, Texas (3,000 ft) - 20 Wells • Canada (5,000 ft) - 15 Wells

  6. STEKOLL Slimhole Operations (2-7/8”) • Drilling & Logging • Perforating & Squeeze Cementing • Acidizing & Fracturing • Fishing & Washovers • Sand Bailing • Dual Completions

  7. Hollow Sucker Rod Advantage • “The hollow sucker rod combines the function of the sucker rod and the tubing, so it is no longer necessary to pull both sucker rods and tubing when working over wells.” • STEKOLL, 1960

  8. STEKOLL System Limitations (1960) • Limited Slimhole Logging Tools • Workover Concerns • Tubing Failures • Resistance to Slimholes • Resistance to New Technology

  9. Leniek Pumping System (1999) 1-1/2” Hydraulic Hose Clamp Production Line Stuffing Box Hollow Polish Rod Gas Vent 2-7/8” or 3-1/2” Casing (CT or Tubing) 1-1/2” Coiled Tubing Hollow Rod Pump Anchor Screen

  10. Leniek CT Pumping System • Conventional Surface Equipment • 1,000 to 5,000 Feet • 2-7/8” or 3-1/2” Casing (CT or Tubing) • 1-1/2” CT (Hollow Sucker Rod) • Hollow Polish Rod • Hollow Rod Pump

  11. “U” Tube Bridel Hydraulic Connector Polish Rod Clamp Dynamometer Holder 1-1/2” Hydraulic Hose Production Line Hollow Polish Rod Lubricated Stuffing Box Leniek Surface Equipment (1999)

  12. Leniek Bottomhole Assembly Gas Gas 2-7/8” or 3-1/2” Casing (CT or Tubing) Oil 1-1/2 Coiled Tubing Anchor Perforations Hollow Rod Pump Screen Oil

  13. Sucker Rod Pumps Pull Rod Coiled Tubing Tubing Tubing Pump Barrel Hollow Pull Rod Pump Plunger Pump Plunger Traveling Valve Pump Barrel Traveling Valve Pump Barrel Conventional Seating Nipple Anchor Standing Valve Standing Valve Conventional Hollow Rod

  14. Leniek System Advantages • Reduce Well Construction Cost 50 Percent • Eliminates Tubing Thread Failures • Eliminates Tubing Anchors • Reduce Lifting Costs • Reduce Paraffin Problems • Reduce Casing Wear • Treat Wells Through CT • Eliminate Rod Failures • Allows Ultraslim Holes

  15. Initial Concerns • CT Fatigue Failures • CT Buckling • CT Wear • Casing Wear

  16. Argentina YPF Test(1998-1999) • San Jorge Basin • 2,600 Foot Well • 60 BPD • 2-7/8” Casing (Tubing) • 1-1/2” CT • 13 Months (No Failures)

  17. YPF Test

  18. YPF Test

  19. YPF Test

  20. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >20 >10 7.61 4.64 2.87 Acceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.500 0.1340 3.500 9.380 100000 1 1 125000 8.33 1 6 74 6000

  21. CT Fatigue Life vs Stroke Rate

  22. Leniek Potential Applications • Marginal Oilfields • Shallow Wells • Low Production Wells (<300 BOPD) • Close Well Spacing • In Fill Drilling • Drill New Wells With Smaller Drilling Rigs

  23. Leniek Marketing Options • Start Service Company • Form Alliances with Service Companies • License Patent Rights to Service Company • Sell Territorial Rights to Operators • Form Partnership With Major Independent • Drill Slimholes Free For Oil Participation • Purchase Shallow Fields and Become Operator

  24. The End Visit our web site: www.maureng.com

  25. Installation & Workover Requirements • CT Rig • New CT • Good Supervision

  26. Future Requirements • CT Centralizers • Low Cost CT Pulling Units • Trained Personnel • Industry Acceptance • Service Company Supplier

  27. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >20 >10 6.66 3.82 2.25 1.35 0.83 0.52 0.33 0.22 0.14 0.09 0.06 0.04 0.03 0.02 Acceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.500 0.1340 2.875 5.059 80000 1 1 105000 8.33 1 6 74 4000

  28. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >10 8.55 4.48 2.43 1.35 0.78 0.46 0.27 0.17 0.11 0.07 0.04 0.03 0.02 0.01 0.01 0.01 0.00 Unacceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.500 0.1340 3.500 9.380 80000 1 1 105000 8.33 1 6 74 4000

  29. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >20 >10 8.53 4.88 2.85 1.70 1.03 0.64 0.40 0.26 0.17 0.11 0.07 Acceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.500 0.1340 3.500 9.380 90000 1 1 115000 8.33 1 6 74 4000

  30. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >10 7.70 3.88 2.01 1.07 0.58 0.33 0.19 0.11 0.06 0.04 0.02 0.01 Unacceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.750 0.1560 5.500 14.500 100000 1 1 125000 8.33 1 4 74 6000

  31. Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure 1000 1207 1414 1621 1828 2034 2241 2448 2655 2862 3069 3276 3483 3690 3897 4103 4310 4517 4724 4931 5138 5345 5552 5759 5966 6172 6379 6586 6793 7000 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >10 7.57 3.70 1.87 0.97 0.52 0.28 0.16 0.09 0.05 0.03 0.02 0.01 0.01 Acceptable Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ 1.750 0.1560 5.500 14.500 100000 1 1 125000 8.33 1 6 74 4000

  32. Flexible Rubber Hose to Oil Lead Line Hollow Polish Rod Gas Vent Conventional Stuffing Box Production Tee 2-7/8” J-55 Non Upset Seamless Tubing Set As Casing 1” J-55 External Upset Seamless Tubing Used as Sucker Rods 1” J-55 External Upset Seamless Tubing Used as Sucker Rods

  33. Elbow Hose Fast Connector Hollow polished rod Stuffing box Check valve Production line Pressure relief or chemical inlet Ground level Surface casing 5-1/2 Casing Perforations 2-7/8 Tubing 1-1/2 Coiled tubing Pump Pump seat Tubing anchor

  34. Sucker Rod Pump in Horizontal Well Pump Jack Pump (30O inclination) Pump (90O inclination) 100-200 ft. Oil

More Related