1 / 16

GLAST Tracker: High-Efficiency Particle Detection System

The GLAST Tracker is a low-profile, modular, and redundant design particle detection system for the Gamma Ray Large Area Telescope (GLAST). It features precise track detectors, a segmented calorimeter, and a charged particle anticoincidence shield for enhanced background rejection. The tracker is designed to minimize multiple-scattering errors and self-veto at high energy.

dwilliam
Download Presentation

GLAST Tracker: High-Efficiency Particle Detection System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GLAST:Gamma Ray Large Area Telescope The GLAST Tracker and its assembly R.Bellazzini 1 Hamamatsu 27/03/2001

  2. GLAST Concept Low profile for wide f.o.v. Segmented anti-shield to minimize self-veto at high E. Finely segment calorimeter for enhanced background rejection and shower leakage correction. High-efficiency, precise track detectors located close to the conversions foils to minimize multiple-scattering errors. Modular, redundant design. No consumables. Low power consumption (580 W) Charged particle anticoincidence shield  Conversion foils Particle tracking detectors • Calorimeter • (energy measurement) e+ e- Pair-Conversion Telescope Photons materialize into matter-antimatter pairs: E -> me+c2 + me-c2 2 Hamamatsu 27/03/2001

  3. Tracker Grid Thermal Blanket ACD DAQ Electronics Calorimeter The Large Area Telescope (LAT) • Array of 16 identical “Tower” Modules, each with a tracker(Si strips) and a calorimeter (CsI with PIN diode readout) and DAQ module. • Surrounded by finely segmented ACD (plastic scintillator with PMT readout). • Aluminum strong-back “Grid,” with heat pipes for transport of heat to the instrument sides. 3 Hamamatsu 27/03/2001

  4. The LAT Hardware 4 Hamamatsu 27/03/2001

  5. One Tracker Tower Module Carbon thermal panel Electronics flex cables GLAST Tracker Design Overview • 16 “tower” modules, each with 37cm  37cm of active cross section • 83m2 of Si in all, like ATLAS • 11500 SSD, ~ 1M channels • 18 x,y planes per tower • 19 “tray” structures • 12 with 3% Pb or W on bottom (“Front”) • 4 with 18% Pb or W on bottom (“Back”) • 2 with no converter foils • Every other tray is rotated by 90°, so each Pb foil is followed immediately by an x,y plane of detectors • 2mm gap between x and y oriented detectors • Trays stack and align at their corners • The bottom tray has a flange to mount on the grid. • Electronics on sides of trays: • Minimize gap between towers • 9 readout modules on each of 4 sides 5 Hamamatsu 27/03/2001

  6. Tray assembling Carbon-carboncloseout • Trays are C-composite panels (Al hexcel core) • Carbon-fiber walls provide stiffness and the thermal pathway • from electronics to the grid. 6 Hamamatsu 27/03/2001

  7. Prototyping of the GLAST SSD Preserie HPK detector on 6’’ wafer Gained experience with a large number of SSD (~5% of GLAST needs) Additional Prototypes: Micron (UK), STM (Italy), CSEM (Switzerland) 7 Hamamatsu 27/03/2001

  8. Calendar Years 2010 2003 2000 2005 2002 2004 2001 Launch Inst. Delivery SRR I-CDR M-CDR I-PDR NAR M-PDR Implementation Ops. Formulation Inst. I&T Inst.-S/C I&T Build & Test Flight Units Build & Test Engineering Models Schedule Reserve SSD Procurement Ladder Production Tray Assembly Project schedule 8 Hamamatsu 27/03/2001

  9. Tests on preserie of final HPK SSD Comparison between HPK and GLAST results Measurements at Hiroshima U. (20), INFN-Pisa (10), SLAC (5) 9 Hamamatsu 27/03/2001

  10. Average tilt Planarity Tests on preserie of final HPK SSD Mechanics and dimension measurements Thickness Strip size = 64 ± 1 mm Pitch = 228.01 ± 0.01 mm Active width = 87557 ± 5 mm 10 Hamamatsu 27/03/2001

  11. Ladder assembly box Alignment Glueing 11 Hamamatsu 27/03/2001

  12. Ladder assembly Trasfer box Service box for bonding 12 Hamamatsu 27/03/2001

  13. Q/A during assembly • Acceptance tests (mechanics and leakage current @150V). • Leakage current after glueing the ladders. • Leakage current after bonding the strips. • Leakage current after encapsulation. • Leakage current after connection to the electronics. • Burn-in of individual strip with cosmic rays. • Complete set of tests (depletion voltage, bulk/interstrip and • decoupling capacitance, isolation resistors, leakage current • before and after irradiation,…) on test structures at the • batch level. • This strongly relies on detailed, stable and well documented tests made at the factory. 13 Hamamatsu 27/03/2001

  14. Alignment measurements Ladder assembly tools manufactured by G&A (Oricola, Italy). Precision of alignment within ± 8 mm 14 Hamamatsu 27/03/2001

  15. BTEM tray and tower assembly 15 Hamamatsu 27/03/2001

  16. Conclusions • R&D and specifications on SSD fully finished. • HPK pre-serie in full agreement with specifications. • Production of ladders can start in fall. • Production strategy strongly relies on mechanical tolerances • and Q/A tests made at the factory. • Production rates of 600-700 SSD per month are required • for more than one year. 16 Hamamatsu 27/03/2001

More Related