1 / 8

Status in France - July 2008

EMCal – France. Status report, July 2008. Manpower Technical activities Physics analyses. 1. Status in France - July 2008. EMCal – France manpower. EMCal – LPSC technical tasks. SM assembly & calibration. Module construction (J.F. Muraz) Construction of strap foils for 3 SMs

dwinn
Download Presentation

Status in France - July 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMCal – France Status report, July 2008 • Manpower • Technical activities • Physics analyses 1 Status in France - July 2008

  2. EMCal – France manpower Status in France - July 2008

  3. EMCal – LPSC technical tasks SM assembly & calibration • Module construction (J.F. Muraz) • Construction of strap foils for 3 SMs • ~ 1/3 machined and delivered to welding company • StripModule & SuperModule tools (J.F. Muraz) • StripModules handling tooling : ready to be sent to Yale • Production of 4 SuperModule platforms • Cosmic calibration test bench (JFM, JSR, CF, SG, PC, RG …) • 16 scintillator paddles under construction • Electronics (CFD, coincidence trigger, CCUSB …) almost available • DAQ installed at LPSC (thanks to T. Awes, D. Silvermyr) • Overall setup to be ready for end of September Status in France - July 2008

  4. DAQ room To/from ECS DDL TTCrx DCS L0-L1-L2-machine clock V0 V0rx FPGA Virtex 5 RJ45 lvds 34/40 links to TRU EMCal – LPSC technical tasks Summary trigger unit • STU requirements (O. Bourrion) • L0 : OR of all L0 provided by the TRU • L1-gamma trigger ( 4x4 tower) • L1-jet trigger ( nxn subregions compared to V0 threshold) • Status of STU • First STU board under construction, expected for end of July 2008 • Tests of functionalities scheduled for September 2008 (TRU-STU link) • DCS : PVSS first implementation for the end of 2008 • V0 threshold : preliminary discussion with IPN Lyon Status in France - July 2008

  5. EMCal – LPSC analysis tasks • Testbeam analysis (R. Guernane) • Study of LED dependence versus temperature • Provide temperature correction over the whole testbeam period • Cosmic test analysis(S. Gadrat, P. Carrivain) • Define the analysis procedure for muon calibration • Detailed comparison with simulation • Electronics mapping tools (R. Guernane) • Provide mapping tools (from tower to STU) for simulation & analysis • PPR expected involvement • EMCal triggering (R. Guernane, C. Furget) • Electron and Heavy flavor (S. Gadrat) Status in France - July 2008

  6. EMCal – Subatech technical tasks • Design • Edition of all fabrication drawings of Modules, StripModules, SuperModules • Management of database of all EMCal 3D models and fabrication drawin • Design + prototypes fabrication of TCards, GTL boards, and IPCBs. • Measurements of friction coefficient of BondPaper. • General equipment • Design and construction of the Insertion Tooling of SuperModules into ALICE + qualification by insertion tests of SuperModule at CERN • Survey marks for EMCal mounted on Calframe. • Design + prototype fabrication of StripModule assembly tooling. • Design + prototype fabrication of pneumatic compression device. Status in France - July 2008

  7. EMCal – Subatech technical tasks • Components procurement • Straps : tender for fabrication of EU straps, selection of companies for StrapFlanges and laser welding ofstraps, management of StrapFlanges production. • Fabrication of StrongBacks on the way. • Fabrication of carriages for SuperModules finished. • Tests and assembly of modules • Visit of WSU assembly site end of july (M. Dialinas, P. Laloux) • Equipment of the dedicated room completed mid-august • Start of the assembly and tests Status in France - July 2008

  8. EMCal – Subatech analysis tasks • Test beam analysis (M. Germain, C. Hadjidakis, R. Ichou) • Pulse shape distributions (R. Ichou) • Calibration withhadrons. (M. Germain) • Physics analyses • PID studies (g, p0) • Direct photons (L. Benhabib, R. Ichou) • g -jet probe (G. Bourdaud) • Jet reconstruction (IPHC – Subatech) • PPR expected involvement • Direct photons and g -jet probe • Jet reconstruction Status in France - July 2008