1 / 7

MUCM going forward

MUCM going forward. Team Meeting, July 2009. MUCM2. Two year project Starting 1 st October 2010 Finishing 30 th September 2012 People Continuation for most of our RAPS But only at 50% FTE (equivalent to just 12 months each) We have to get other funding to run alongside MUCM2

dympna
Download Presentation

MUCM going forward

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MUCM going forward Team Meeting, July 2009

  2. MUCM2 • Two year project • Starting 1st October 2010 • Finishing 30th September 2012 • People • Continuation for most of our RAPS • But only at 50% FTE (equivalent to just 12 months each) • We have to get other funding to run alongside MUCM2 • Flexibility will be essential • Team working even more important • Continuation for Jo (40%), me (20%), co-investigators (10%)

  3. Research • Exploring and scoping new areas • Developing only far enough to break the ground • Publish initial findings and/or case studies • Draw up research proposals • Objective is to set up grants and contracts to tackle these new areas • And so to take MUCM forward beyond MUCM2 • Four workpackages • Random outputs • Informing decisions • Heterogeneity • Building the community

  4. Random outputs • Different types of random simulators • Micro-simulation models in health economics • Agent-based models • Systems biology models • Stochastic finite elements models • Challenges • Emulating a distribution • Design • Model discrepancy • Calibration • Dynamic emulation • Extremes • Superparametrisation

  5. Workpackages 2 and 3 • Informing decisions • Optimisation • Coupling models • Decisions that expand models • Fitness for purpose • Risk metrics • Heterogeneity • Discontinuities • Heterogeneous variance

  6. Building the community • Toolkit • More introductory material and examples • New stuff, too • Short courses • At conferences in targeted application areas • Video podcasts/seminars • Linked to/from toolkit • Website • Community resource • .ac.uk address • Sustainability

  7. Where does this leave MUCM? • We must complete the research programme • MUCM2 is not there to finish things we didn’t complete in MUCM • Workpackages based on doing new research will deliver • Themes 1 and 2, plus 3.1 • But concentrate now on completing research, publications • We have to make special efforts to deliver on - • Toolkit • Case studies • MUCM will be judged on these • Management becomes important again!

More Related