An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waterstar(sm) Demonstration ProjectatPalm Coast Utility Office

  2. Existing Partnerships St. Johns River Water Management District (SJRWMD) Watershed Action Volunteers (WAV) Annual Intracoastal Waterway Cleanup Educational Outreach Florida Water Star Demonstration and Retrofit Project City of Palm Coast Utility Offices will be retrofitted and assessed for water conservation and savings Irrigation, landscaping, pervious paver and rain garden exhibit

  3. Waterstar Concepts Demonstrated Waterwise practices Three types of sod examples Low flow toilets and urinals in offices Rain barrel example plumbed to roof Pervious brick pavers Rain garden Waterwise plantings labeled Informational kiosks (2) Low volume irrigation on reuse water Interactive Irrigation controller station on kiosk

  4. Florida Water Star Demonstration

  5. Benefits of This Project • Citizen education • Low impact development techniques • School children education • “Poster child” for Waterstar • Water conservation monitoring • A more attractive place of business

  6. Schedule for Construction • Site preparation-currently underway • Grading- Friday Sept. 3rd • Paver installation- Sat-Sun, Sept. 4,5th • Landscape/ irrigation- Sept. 6-13th • Kiosk and signage installation- Sept. 27 • Project complete- Sept. 30th