An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MassDEP’s Discussion Document Overview 7 March 2014

  2. Background • MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine noise impacts • Scope: • Potential revision to existing noise policy • Pre-construction impact assessment • Pre-construction permitting process • Post construction compliance sampling

  3. Overview • Approaches to Determining Compliance with Noise policy • Pre-Construction Permitting • Additional Recommendations • Next Steps

  4. Compliance • Retain the10 dBA above background limit • Approach For Discussion: • Leq + Adjustment Factor- L90 ≤ 10dBA • Adjustment Factor to be determined (to be protective) • Collect at least 15 minutes of data Turbine “On” and Turbine “Off” under comparable wind conditions • “A’ Weighted sound collected on “Fast” setting

  5. Compliance • Alternative Raised: • Collect 1 Second LAFmax withTurbine “On” and Turbine “Off” • Compare L90 of 1 Second LAFmax Turbine “Off” to 1 second LAFmax Turbine “On” + Adjustment Factor • Adjustment factor value tbd. • Collect at least 15 min data Turbine “on” and Turbine “off” under comparable wind conditions

  6. Pre-Construction Permitting • Permit Required • 1 MW and greater • Public review and comment • Self Certification • 0.1 MW(100 kW) to 0.999 MW • Option to apply for permit • Conditions: • Pre-construction impact evaluation (modeling). • Demonstrate ability to comply with 10 dBA threshold • Post-construction monitoring required

  7. Additional Recommendations • Attended sampling preferred/required. Input sought on how unattended sampling could be used for Leq data. • No specific limit on the amount of allowable amplitude modulation included; Adjustment Factor used to address modulation • More comprehensive guidance on pre and post construction sampling will be issued in addition to regulations. • Use of Preconstruction background data for post construction compliance determination.

  8. Next Steps • All of the input from WNTAG to be considered as MassDEP drafts a new regulation and Technical Support Document • Some of the Technical Issues also informed by the final RWSTA Report (Spring/ Summer 2014) • MassDEP to draft and issue additional guidance on monitoring and modeling wind projects • Regulations will go out to public hearing and comments considered before final adoption.