1 / 19

INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07/04/2011 Brussels

INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07/04/2011 Brussels. RWTH, Martin Müther. Face to face meeting SP A3 – Brussels, 7 April 2011. 2. Review meeting – Brussels, April 2011 MM allocation RWTH. Review meeting – Brussels, April 2011 MM allocation RWTH.

eagan-pitts
Download Presentation

INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07/04/2011 Brussels

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07/04/2011 Brussels RWTH, Martin Müther

  2. Face to face meeting SP A3 – Brussels, 7 April 2011 2

  3. Review meeting – Brussels, April 2011MM allocation RWTH

  4. Review meeting – Brussels, April 2011MM allocation RWTH

  5. Review meeting – Brussels, April 2011

  6. Review meeting – Brussels, April 2011 Performance prediction referenced to 1.9 l (Z19DTH)

  7. Review meeting – Brussels, April 2011

  8. Basic Diesel engine (Z19DTH): CAD-Data  Spark plug application  Analysis of CAD-Data

  9. Review meeting – Brussels, April 2011

  10. Review meeting – Brussels, April 2011

  11. Review meeting – Brussels, April 2011

  12. HPT-BP HPC-BP LPT-WG Review meeting – Brussels, April 2011 serial / serial System specific actuators • High-Pressure-Turbine bypass • low speeds -> controlled wastegate function for High Pressure Turbine • from mid speed on complete mass flow bypassed toward Low Pressure Turbine • High-Pressure-Compressor bypass • back pressure valve • on/off bypass (not active) • Low-Pressure-Turbine wastegate • conventional function of turbine control

  13. Review meeting – Brussels, April 2011

  14. Piston design (CR=13CR=12 (Final)) IMG_2592.jpg K:\B_Technical_Status\04_Engine\044_Kolben\Fotos\20090605 IMG_0004.jpg K:\B_Technical_Status\04_Engine\044_Kolben\Fotos\20100601 CR=13.0 CR=12.0 • Increased bowl-diameter (‚open bowl‘) • Increased pocket-width • Unchanged Squish Height: 0.83 mm Reduced squish area share  Machining at FEV

  15. Review meeting – Brussels, April 2011

  16. MCE-TestingDefinition of Operation Points Steady-State-Replacement-Test (NEDC) Reference: ZAFIRA (1.9 CDTI) 6 Speed Gearbox BMEP vs. Eng.-Speed S Idle: 326 s S Push: 138 s S Part Load: 716 s Additional Points MAP-Completion Highest Relevance Breakdown (Modes) Urban: 3x Extra-Urban: 1x

  17. Engine Testing / Procedure Hypercube  3-dimensional experiment space (DoE-Methodic) Operation point (Mode 4): n=1754 rpm BMEP=6.2 bar • Variables: • Ignition Timing (ZZP) • Rel. A/F-Ratio (LAM; l) • End of NG-Injection (EOI) Due to the significant impact of the NG-injection-window on engine behaviour, this parameter has been included in the DoE-Testing ! ZZP  Hypercube-Parametrisation is Mode-specific ! EOI LAM

  18. MCE-TestingMAP-Generation / Procedure • Setup of DoE-Modell for each defined operation pointconsidering operation limits • Stationary MCE-Testing ( DoE-Parameterisation) • DoE-Analysis  Modell-Calculation / Generation of functionalities • Engine MAP-Generation assuming different szenarios • TExhaust > Limit value (presetting) • BSFC, NOx, HC min. • Ignition Timing (presetting) • … • Projection on cycle (i.e. NEDC) (Presetting: Vehicle & gear box) Testing Calculation (Weighted) Combination possible

  19. Review meeting – Brussels, April 2011 BACKUP  Slides concerning documentation of activities