An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Layout Adapted from: Facilities Planning, Tompkins, White, Bozer, Frazelle, Tanchoco, Trevino, Wiley, New York, 1996

  2. Graph-Based Construction Method 1 1 2 I 3 9 2 8 4 10 12 5 3 13 0 7 20 4 0 2 5

  3. Adjacency Graphs – Version A 1 0 9 5 7 2 2 13 12 4 20 3

  4. Adjacency Graphs – Version B 1 5 2 4 3 0 7 9 10 13 12 20

  5. Graph-Based – Step 2 2 4 3 12 13 20

  6. Graph-Based – Step 3 1 2 4 3 9 12 13 10 8 20

  7. Graph-Based – Step 4 1 5 2 4 3 7 9 13 12 0 2 10 8 20

  8. Block Layout From The Final Adjacency Graphs 12 2 13 9 7 0 1 5 8 2 10 3 4 20

  9. Developing Alternative Layouts • Exert the necessary effort • Set a time limit – People need deadlines or milestones to mark progress on a long term project (celebrate small victories) • Seek many alternatives – decision makers will expect to see several options • Establish a goal – without a goal, success is difficult to measure • Make liberal use of the questioning attitude – 5 W’s, Devils advocate • Don’t get bogged down in details too soon – many times technical and operational people will tend to look at the details of a particular aspect of a project rather than continue to consider other alternatives.

  10. Developing Alternative Layouts • Don’t “fail to see the forest for the tress” – fail to see the big picture because the focus is on the details • Think big, then think little – do not limit your thinking - consider the ideal situation even though it is not feasible • Don’t be conservative - • Avoid premature rejection – let seemly wild ideas remain in consideration until a large number of ideas have been developed and considered

  11. Developing Alternative Layouts • Avoid premature acceptance – do not jump to a solution – continue to develop alternatives • Refer to analogous problems of others • Consult the literature • Consult peers in other organizations • Use the brainstorming technique • Divorce your thinking from the existing solution • Spread the effort out over time – creativity often requires time to develop

  12. Developing Alternative Layouts • Involve operating people – people closest to the process often: • Understand the process better than anyone else since they operate it everyday • Know details about the process that are otherwise unknown to engineers and management • Management needs the buy-in of operators to make the new layout function to its full capability • Motivated people can make a bad plan work and a good plan fail

  13. Developing Alternative Layouts • Involve management • Need management support for any large decision • May provide insight about: • Future business plans not documented in formal plans • Industry trends • Market trends • Experiences at other facilities – many managers have managed other facilities in the organization or other organizations, which may lead to lessons learned • May have contacts at other companies for benchmarking

  14. Developing Alternative Layouts • Involve experienced people • Know a lot about the process • Know what has works and not worked in the past • Are often leaders (both formal and informal) that will be very influential to others in the facility – thus if the leaders are involved, then they will likely buy-in the decisions and support than during implementation

  15. Developing Alternative Layouts • Involve inexperienced people • Do not know a lot about the process and thus are not biased toward a given solution • Often provide new ideas from their previous experience • Bring enthusiasm to the project since they were chosen to be a part of the layout process

  16. Developing Alternative Layouts • Involve those who oppose change • If you can convince that person that the new layout is a positive change, then others will be influenced by that person’s conversion • These people, once converted, will often be your best advocate for the new layout • Involve those who promote change • Often open to new ideas • Willing to sell those ideas to others • Good at offering new ideas

  17. Developing Alternative Layouts • Be aware of what the competition is doing • Do not get caught by surprise by what the competition/industry is doing • Recognize your own limitations • Look for trends • Do your homework first • Understand the requirements • Don’t overlook an improved present method • Think long range

  18. Need For Change • Changes in design of product • Eliminating products from the product line • Introduction of new products • Changes in process sequence for existing products • Replacement of equipment • Changes in production quantities and schedule • Changes in organizational structure

  19. Planning for Facility Reorganization • The facility should have a long term plan that supports the long term plan of the organization • The facility “Master Plan” should: • Attempt to anticipate future requirements • Make provisions for adapting to changes in facility requirements – otherwise a decision could be made that will significantly limit future changes • Placement of shipping and receiving docks • Location of heavy machinery and other equipment that are difficult to move • Clear building heights • Load bearing walls

  20. Pallet Security Options • Glue – concrete • Stretch wrap – bonds to pallet and around 3 times – when an interlocked pattern cannot be found, irregular shaped objects, • Shrink wrap – plastic bag to cover the load and apply heat – boxes, bags, - anything to cover to keep moisture from entering