An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Biogas FuelledCogeneration Systems Jan Buijk 416-804-2203 buijkjan@ddace.com

  2. Separator sheet • Use this range of background colors to introduce new sections Construction Phase

  3. Farmer’s Responsibility during Construction Phase • Award contract & issue a down-payment • Coordinate activities of engineering firm, equipment supplier(s) and installation contractor • Ensure the utility interconnection approval is in place (or delegate to engineering firm) • Review drawing submittals (or delegate to engineering firm) • Ensure Technical Instruction documents are followed

  4. Responsibility of the Equipment Supplier During Construction Phase • Confirm acceptance of purchase order • Place equipment order with factory and outside suppliers (if applicable) • Organize internal kick-off meeting

  5. Activities that take place during Construction Phase • Project kick-off meeting with customer • Provide detailed design drawings and technical details as required to complete system design and integration • Site visit(s) during construction period • Meetings with engineering firm/installation contractor/electric utility as required to address equipment performance and other details • Site audit prior to start-up and commissioning • Identify deficiencies (equipment / installation) • Installation start-up • Project hand-over to customer

  6. Potential Problems during/after Construction Phase • Utility interconnection approval • Coordination of site activities • Under-sizing of cooling systems (radiators/ventilation), gas piping, coolant piping, heat exchangers etc. • Control system details – interface with balance of plant equipment and services • Implementation of high speed internet access for remote monitoring system • Gas quality / composition

  7. Sulfur Content • Sulfur •  H2S < 500 mg/10 kWh •  Standard maintenance schedule •  H2S < 2000 mg/10 kWh •  „modified“ maintenance schedule • acidification of oil • reduced Oil lubricity • SOx + H2O  corrosion • deposits in exhaust gas heat exchanger, when temperature is below dew point Sulfate deposits exhaust gas temperature below dew point

  8. What is the Timeline • Kick-off Meeting: 3-4 weeks ARO (after receipt of order) • Drawing submittal: 60 days ARO • Equipment delivery: 6-7 months ARO • Start-Up: 9-12 months ARO • Hand-Over: 10-12 months ARO

  9. Thank You! Jan Buijk buijkjan@ddace.com 416-804-2203