An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE TOFes construction & planning M. Bonesini INFN Milano M. Bonesini - 08/06/06 Fermilab

  2. Outline • Present design of TOF0 (TP endorsed) • BTF testbeam plans • TOF1 design • TOF2 design M. Bonesini - 08/06/06 Fermilab

  3. Rates (Singles per ms) target insertion reduced to get 600 good mu+/sec (AUG05) 6 pi beam from T. Roberts M. Bonesini - 08/06/06 Fermilab

  4. 1pi beamline design from D. Adams M. Bonesini - 08/06/06 Fermilab

  5. Present design of TOF0 • From D. Adams & T. Roberts simulations a 40 x 40 cm2 active area and a 4 cm segmentation seems a good choice • BC-420 scintillator bars 40 x 4 x 2.5 cm3 ordered at Bicron (emission peak ~390 nm) • simple fish-tail lighguides UVT plexi M. Bonesini - 08/06/06 Fermilab

  6. A detailed description of TOF0 and related tests (PMT, cosmics …) is in preparation and will be delivered soon as MICE note M. Bonesini - 08/06/06 Fermilab

  7. TOF0 prototype • mechanics: • Some barrettes (BC420 40 x 4 x2.5 cm3) ready with fish-tail lightguides + PMTs (R4998) • Additional barrettes with different scintillators (BC408/BC404/BC420/EJ230) and size (6cm witdth) ready • electronics + DAQ : • QADC + TDC (V792 + V1290) in hands; no Nino-chip • DAQ (ftom JS) in hands M. Bonesini - 08/06/06 Fermilab

  8. TOF frond-end electronics 3 choices, in order of difficulty: • CF discriminator + TDC only • Splitter + L.E. discriminator/TDC + QADC • ALICE Nino chip (integrator+ fast discriminator) + TDC M. Bonesini - 08/06/06 Fermilab

  9. Discriminator choice Choice between: • CF discrimininator : no need of time-walk correction no QDC line/splitter needed, but st is usually worse • L.E. discriminator: st is usually better, but a QDC is needed • ALICE NINO chip: it includes a discriminator + an integrator to make possible TOT correction (slightly equivalent to p.h. correction). According to ALICE coll. solution 3 is equivalent to 2 Problem: while solutions 1-2 are commercial ones (CAEN or …); solution 3 needs some R&D M. Bonesini - 08/06/06 Fermilab

  10. The BTF testbeam • Testbeam 10-20 July allocated at BTF • We will have our DAQ based on CAEN V2718 (not use default BTF one, Labview based) • We can test TOF resolutions, not rate effects (for this we can do only lab tests with our laser system) M. Bonesini - 08/06/06 Fermilab

  11. What we plan to test in BTF, as regards TOF FEE • MICE baseline-1 solution: V1290 TDC + CF discriminator CAEN V812B (Mb-1) • MICE baseline-2 solution: Harp splitter + V1290 TDC + QADC + L.E. discriminator. For the time being QADC will be V792, waiting for new CAEN QADC based on V1724, to be delivered end of this year (Mb-2) M. Bonesini - 08/06/06 Fermilab

  12. Some considerations for TOFFE • MICE baseline-1 solution is easy and if works minimize manpower (our more delicate issue) • we can try to adopt Mb-1 to proceed later to Mb-2 (still reduce manpower) • Real delicate point: choice of CF discriminator M. Bonesini - 08/06/06 Fermilab

  13. What is needed for TOF at BTF • TOF0 prototypes equipped with R4998 PMTS – ready • additional counters to be tested ( diff scintillator, lengths, fine mesh PMTs): useful for TOF1/2 – ready • Finger counters to define precisely beam impact point available from MEG tests - requested • HV/signal cables, splitters, NIM discriminators, VME modules – to be checked, but available • CAEN VME CF discriminators – to be requested (EP Pool ?) • DAQ (JS) – ready, cloned in Milano • monitoring (JS) – ready • pre-test with cosmics to debug full size counters: in preparation in Milano M. Bonesini - 08/06/06 Fermilab

  14. TOF testbeam targets: • TOF0 with simple MCA • Test time resolution at various positions with single particles • TOF0 with full DAQ • Test time resolution at various positions with single particles • Test time resolution with particle pile-up • Make comparisons with TDC+CF discriminators and TDC+QADC measurements • TOF1/2 with full DAQ • Test time resolution with cheaper UPS-95F counters • Test time resolution with bigger detectors • Test time resolution with fine-mesh 1”,1.5” PMTs (if possible) M. Bonesini - 08/06/06 Fermilab

  15. Some side considerations for TOF1/TOF2 • up to know only fine-mesh PMT solution considered • But problem: their cost has increased as respect to previous quotations by 50% !!!! (increase of cost of fine-mesh grids, according to Hamamatsu) , R4998 are better (smaller TTS, rate capability, …) and in a short time Hamamatsu may discontinue their production • studies by J. Cobb+ H. Witte to see if we can change B// (not shieldable in conventional PMTs) into B_|_ (shieldable) M. Bonesini - 08/06/06 Fermilab

  16. TOF 2 PMT geometry Most of the following is just paste&cut from John&Holger notes/studies credits&questions to them M. Bonesini - 08/06/06 Fermilab

  17. B field components at TOF2: no iron shield From John&Holger 2-D computations M. Bonesini - 08/06/06 Fermilab

  18. B field at TOF2: one 100 mm iron shield M. Bonesini - 08/06/06 Fermilab

  19. B field is ~ 200 G //; ~ 0.1 T _|_ M. Bonesini - 08/06/06 Fermilab

  20. B field at TOF2 with 2 iron shields sandwiching TOF2 M. Bonesini - 08/06/06 Fermilab

  21. B// ~ 40 Gauss, B_|_ ~ 0.13 T • Problem: individual PMTs must be shielded with soft iron, but this implies a 3-D calculation to be completely sure • Valuable option to be finalized • (conventional PMTs cheaper + better performances) M. Bonesini - 08/06/06 Fermilab

  22. TOF1 baseline • 48 x 48 cm2 active area (still OK?) • if 2nd global shielding adopted: conventional PMTs • request funds for 2007 (+ TOF0 electronics) M. Bonesini - 08/06/06 Fermilab

  23. TOF2 baseline • 60 x 60 cm2 active area (it was 48 x 48 cm 2 active area, as based on previous MC simulations …) • if 2nd global shielding adopted: conventional PMTs • request funding for 2008 M. Bonesini - 08/06/06 Fermilab

  24. Conclusions • up to now we are in schedule • good news: Pavia (G. Cecchet et al.) will join us on TOF • bad news: still pending full INFN approval (this gives problems for thesis, workshops use …) • realistic requests: 2007 TOF0 electronics+ TOF1 ; 2008 TOF2 M. Bonesini - 08/06/06 Fermilab