An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOF plans for July BTF testbeam M. Bonesini INFN Milano M. Bonesini - PC 194 - 19-05-06

  2. Present design of TOF0 • From D. Adams & T. Roberts simulations a 40 x 40 cm2 active area and 4 cm segmentation • BC-420 scintillator bars 40 x 4 x 2.5 cm3 delivered by Bicron (emission peak ~390 nm) • lightguides UVT Repsol or BC800 plexiglas M. Bonesini - PC 194 - 19-05-06

  3. Prototype mechanics • TOF0 counters CAD design ready • scintillators delivered (Bicron BC-420) + low cost Ukrainian UPS-95F • lightguides with REPSOL Glass plexiglas + in-house machining M. Bonesini - PC 194 - 19-05-06

  4. The BTF testbeam • Testbeam 12-20 July (setting up during 7-11 July P326 testbeam) • We will try to have our DAQ based on CAEN V2718 (not use default BTF one, Labview based) • We can test TOF resolutions, not rate effects (for this we can do only lab tests with our laser system) M. Bonesini - PC 194 - 19-05-06

  5. What we plan to test in BTF, as regards TOF FEE • MICE baseline-1 solution: V1290 TDC + CF discriminator (Mb-1) • MICE baseline-2 solution: Harp splitter + V1290 TDC + QADC + L.E. discriminator. For the time being QADC will be V792, waiting for new CAEN QADC based on V1724, to be delivered end of this year (Mb-2) M. Bonesini - PC 194 - 19-05-06

  6. What is needed for TOF at BTF • TOF0 prototypes equipped with R4998 PMTS – ready • additional counters to be tested ( diff scintillator, lengths, fine mesh PMTs): useful for TOF1/2 – ready • Finger counters to define precisely beam impact point available from MEG tests - requested • HV/signal cables, splitters, NIM discriminators, VME modules – to be checked, but available • CAEN VME CF discriminators – to be requested • DAQ (JS) – ready, to be cloned in Milano • monitoring (JS) – ready • pre-test with cosmics to debug full size counters: in preparation in Milano M. Bonesini - PC 194 - 19-05-06

  7. TOF testbeam targets: • TOF0 with simple MCA • Test time resolution at various positions with simple particle • TOF0 with full DAQ • Test time resolution at various positions with single particles • Test time resolution with particle pile-up • Make comparisons with TDC+CF discriminators and TDC+QADC measurements • TOF1/2 with full DAQ • Test time resolution with cheaper UPS-95F counters • Test time resolution with bigger detectors • Test time resolution with fine-mesh 1”,1.5” PMTs M. Bonesini - PC 194 - 19-05-06

  8. Conclusions • up to now for TOF0 prototypes we are in schedule for BTF testbeam • Another testbeam (especially for calo) will be needed in September/October: think also to it • only problem organization: avoid to have ~20 people in July and maybe ~0 in forthcoming September/October tests -> proposal: to have Ludovico as BTF MICE testbeam coordinator to handle matters, also acting towards LNF management M. Bonesini - PC 194 - 19-05-06