1 / 7

WECC Reliability Management System

WECC Reliability Management System. Reliability Management System Louise McCarren WECC CEO. Louise McCarren WECC CEO. WECC. One of 10 Members of NERC Covers the Western Interconnection All or parts of 14 Western States British Columbia Alberta Baja California Mexico

eddy
Download Presentation

WECC Reliability Management System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WECCReliability Management System Reliability Management System Louise McCarren WECC CEO Louise McCarren WECC CEO

  2. WECC • One of 10 Members of NERC • Covers the Western Interconnection • All or parts of 14 Western States • British Columbia • Alberta • Baja California Mexico • Voluntary organization

  3. WECC Mission • Maintain a reliable electric power system in the Western Interconnection • Support effective competitive power markets • Assure open and non discriminatory transmission access among Members • Provide a forum for resolving transmission access disputes between Members

  4. WECC RMS • Developed following industry move to competition and 1996 outages • Contractual arrangement between WECC and transmission operators • Approved by FERC • Business letter from DOJ • Covers key reliability requirements • Enforcement through letter or monetary sanctions for noncompliance

  5. WECC RMS • Improve compliance until legislation enacted • Mandatory standards and compliance critical to a reliable transmission grid • Implemented in a phased approach • 3rd and final phase submitted to Commission with a requested effective date of January 1, 2004

  6. WECC RMS • 23 of 33 WECC control areas have signed RMS agreement • 88% of load - 83% of generation • Working to increase participation • Accountability through RMS data reporting reinforces compliance with standards

  7. Reliability Legislation • WECC supports reliability legislation and mandatory reliability standards • Provisions important to WECC: • Delegation of authority to conforming regional entities • Deference to Interconnection-wide entities • Creation of Regional Advisory Bodies • WECC RMS is only interim solution pending reliability legislation