NOBEL Technical Audit WP 4 Objectives & Achievements February xx, 2005

NOBEL Technical Audit WP 4 Objectives & Achievements February xx, 2005. Work P ackage 4 Network Management and Control/Protocols Monika Jäger, T-Systems. Scope of WP4.

Download Presentation

NOBEL Technical Audit WP 4 Objectives & Achievements February xx, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOBEL Technical AuditWP4 Objectives & AchievementsFebruary xx, 2005 Work Package 4 Network Management and Control/Protocols Monika Jäger, T-Systems WP4

  2. Scope of WP4 • To analyze and propose simplified strategies and interworking of Network Management and Control of core and metro networks. • In collaboration with work packages from WPG1, WPG2 and WPG3, to investigate MP and CP aspects, and to develop strategies/functions for evolutionary NOBEL network architectures and scenarios. • To investigate a comprehensive set of aspects and functions in detail, leading to simplified solutions which will be communicated towards standardization. • Accompanying the conceptual studies, to perform NM and ASON/ GMPLS prototype implementations and experimental evaluations, in collaboration with WP8. WP4

  3. WP4 Overview and Goals of Year 1 • Summarize in a few words the goals and the achievements of Y1 WP4

  4. WP4 Activities • A4.1 - Network Management (NM) and Control/Protocol (CP) requirements and functional scope • A4.2 - Performance, fault management, fault localization and QoS monitoring requirements and solutions • A4.3 - Inter-domain, multi-layer NM and CP and Service Management aspects • A4.4 - Standardization approaches, especially centralized vs. distributed implementation of NM and CP functions • A4.5 - NM and CP prototype function and design specification, implementation and test WP4

  5. WP4 Partners Contributing partners (total manpower for 2 years): • Telecom Italia Lab 30 MM • Alcatel CIT 65 MM • Alcatel Italia11 MM • Ericsson2.5 MM • Lucent Nederland BV 18 MM • Marconi ONDATA 23 MM • Marconi Comm. S.p.A. 27 MM • Siemens 28 MM • Telefonica 28 MM • TeliaSonera 12 MM • T-Systems (WP4 coordinator) 34 MM WP4

  6. WP4 Partners II Contributing partners (total manpower for 2 years): • ACREO 9 MM • France Telecom 7.5 MM • Scuola Sup. S. Anna23 MM • Telenor20 MM • CTTC 11.5 MM • TOTAL 349.5 MM WP4

  7. Network Scenarios and Use Cases WP4

  8. Client (User) - A Network Provider - A Network Provider - B PPI UPI MP MP NMI-A UNI-C UNI CP CP CP Intra-carrier E-NNI Inter-carrier E-NNI NMI-T CCI TP TP TP TP CP = Control Plane MP = Management Plane TP = Transport plane UNI = User Network Interface E-NNI = External Network Network Interface = SubNetwork NMI-A = Network Management Interface, MP-CP NMI-T = Network Management Interface, MP-TP CCI = Connection Controller Interface UPI = User-Provider Interface PPI = Provider-Provider Interface Reference Points and Domains in WP4 WP4

  9. WP4 Task Forces • Picture depicting all TF and activities • Network scenarios (WP1) • Use Cases • Centralized vs distributed • UNI • IM • OPM • Implementation WP4

  10. Main Results • UNI TF WP4

  11. Main Results • GFP LCAS VCAT Task Force WP4

  12. Main Results • Centralized versus Distributed WP4

  13. Main Results • Information Modelling Task Force WP4

  14. Main Results • OPM WP4

  15. Main Results • Implementation WP4

  16. WP4 Deliverables • D2 “”Definition of Network Management and Control requirements of network scenarios and solutions supporting Broadband Services for All”. D2 reports on the identification and discussion of the high-level management and control requirements of the NOBEL network, for the provision of network services to user-applications triggered from client networks. (April 2004) • WP4 is working on Deliverable D18 “Conclusions on NM and CP functional scope and standardization approaches; NM and ASON prototype functional scope”. (to be delivered March 2005) WP4

  17. WP4 Publications • NOC • ONDM WP4

  18. Summary and Self assessment • this is a slide which Monica may use to set up a WP4 summary. • first ideas to be collected during CC. • to be finalized as soon as all material for results is available. WP4

  19. Plans for year 2 • Centralized vs Distributed • VPN Task Force • GFP/ LCAS/ VCAT TF • NNI Task Force • Signaling Framework for interoperability issues at I-NNI and E-NNI • Inter-Carrier E-NNI issues • IM Task Force • OPM Task Force • Implementation Task Force WP4

  20. Backup slides WP4

  21. Signaling Framework TF Objectives and Status • Resolve interoperability issues raised by the NOBEL scenarios, such as I-NNI, E-NNI, and corresponding (signaling) protocol issues: • Cooperation between MPLS-GMPLS • Convergence between ASON and GMPLS concepts and paradigms • Propose enhancements to an IP-based signaling protocols for the end-to-end service and the vertically integrated control plane vision of NOBEL • The work may cover issues and solutions pertaining to signaling (intra- and inter-carrier), addressing, routing, and Traffic Engineering . In addition, we consider security, policy control, business models etc • Status: work started by the beginning of December. First TF document is under preparation. (Deadline: February) • Number of contributing partners: 5 or 6 WP4

  22. VPN TF Objectives and Status • Propose a potentially homogeneous solution to (control plane-based) Layer 1, 2, and 3 VPNs, and their management issues with reference to the NOBEL scenarios • The work may cover definitions, info-models, functions, and architecture aspects to control plane-based VPNs as well as VPN management functions (i.e. PE/CE-based) for both customer service management and provider network management • Status: work started by the beginning of December. First TF document is under preparation. (Deadline: February) • Number of contributing partners: 7 or 8 WP4

  23. ??? Task Force WP4