Spine Progress

Spine Progress. R. Bates. Status. MT, PA, HGM and I visited IHEP (29/03/203) Spine production explained NIIGraphite Produce raw TPG NIITAP Machine/polish and coat TPG Produce all ceramic parts IHEP Assemble Spines (including washer at CERN) Manage project in Russia

edita
Download Presentation

Spine Progress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spine Progress R. Bates

  2. Status • MT, PA, HGM and I visited IHEP (29/03/203) • Spine production explained • NIIGraphite • Produce raw TPG • NIITAP • Machine/polish and coat TPG • Produce all ceramic parts • IHEP • Assemble Spines (including washer at CERN) • Manage project in Russia • And production bottlenecks explained

  3. Towards faster delivery • Two new contracts for spine production to finish by 1st Jan 2005 • NIIGraphite; cost = 19100USD • Increased TPG production • IHEP (subcontracts to NIITAP); cost = 31500USD • Increase Ceramic production, TPG polishing/machining • Increase spine assembly, including CERN based technician • Initial extra 7500USD then 3000USD for each month production over 200 spines

  4. Some action so far • Regular phone meetings are held with IHEP • Better book keeping of spines at CERN • Greater understanding of bowed spines • Reduced spine damage in transport • More washer gluing jigs at CERN • Faster assembly at IHEP (double shifts) • New, fast, TPG production schedule produced by NIIGraphite • Slight change in machined section of spine to increase yield under investigation • Extra polishing equipment sourced at NIITAP • Last two points will increase yield and rate at NIITAP

  5. Present delivery rates • Rates from database • Reason why NIKHEF is zero module production • Spine rate just matching present module rate • Falls short of desired module rate