E-Rate K12 Network Update. E-Rate K12 Network Update. New contract awarded to AT&T Contract to supply 15Mbps per school Contract term is 1 year with 1 year option (if needed) Planned move to PeachNet ® July 1, 2015. AT&T Upgrade from 3Mbps to 15Mbps.
E N D
E-Rate K12 Network Update New contract awarded to AT&T Contract to supply 15Mbps per school Contract term is 1 year with 1 year option(if needed) Planned move to PeachNet® July 1, 2015
AT&T Upgrade from 3Mbps to 15Mbps Circuits: DS3, New Ethernet and Existing Ethernet upgrades Survey must be completed http://apps.gadoe.org/districts/iucontacts.nsf Information used to place orders and install Communications will be directed by groupings for specific circuit activities outside of direct communications
AT&T UpgradeLCON: What to expect Site visit(s): Must be scheduled ASAP, Site Ready - a list of items to be completed in order to be “Site Ready” will be provided by the Engineer. Router: New Routers or Reconfiguration will depend on our current circuit and bandwidth. If new, they will be shipped to your attention.
AT&T UpgradeLCON: What to expect Access Circuit Delivery: You must be available for engineer access to facilities. Please mark your new circuit. Test and Turn-up: You will schedule when you are available to assist with testing. Circuit outages will vary from 15min to 1hr.