1 / 27

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project. Programme of Work & Budget. Marie Calmel & Anne Martinet ONF International 6 th August 2013 1 st Steering Committee, Paramaribo. Activities and budget global overview Per component:

edolie
Download Presentation

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REDD+ FOR THE GUIANA SHIELDTechnical Cooperation Project Programme of Work & Budget Marie Calmel & Anne Martinet ONF International 6th August 2013 1st Steering Committee, Paramaribo

  2. Activities and budget global overview • Per component: • Presentation of activities, planning and products • Focus of 2013 budget and activities (spent and to be spent, achievements and to be completed) • Issues to be discussed • To be validated during this Steering Committee Meeting Presentation

  3. Activities and budget global overview

  4. Component 1 • Products • Document providing an overview of existing initiatives in the countries and at regional level • 2 study reports on existing data on forest cover, forest carbon stocks and their changes (including recommendation, detailed listings and consolidated statement data) • Intermediate and final results presented and discussed during working groups meetings

  5. Component 1 • Products • 1 Working Group on forest cover and changes monitoring • 1 Working Group on forest carbon stocks and changes monitoring • A program of meetings and technical exchanges for each of the working groups • Meetings of working groups

  6. Component 1 • Products • Plan for training and technology transfer • Equipment, material and satellite images oriented for research and capacity building • Strengthened capacities • Training material

  7. Until now: • Snapshot on component 1 To be completed by the end of 2013: • Preparation and implementation of studies 1&2 • Presentation of interim results • Constitution of the 2 WGs • Identification of priorities for training and technology transfer Component 1: Budget and tasks for 2013

  8. Discussion

  9. Component 2 • Products • Descriptive document on direct and underlying causes of deforestation/degradation in the region • Study on the indicators and methodologies for monitoring the direct and underlying causes of deforestation/degradation • Report and presentation of results and of discussions in Working Group 3

  10. Component 2 • Products • Spatial database completed for the existing and prepared for monitoring • Training in GIS • Enhanced GIS capabilities • Training Material

  11. Component 2 • Products • Formation of Working Group 3 • Program for discussion and exchange of the working group • CR Meeting of the Working Group • Strategic Document for identification, monitoring and management of cross-border dynamics of deforestation / degradation

  12. Until now: • Snapshot (component 2) To be completed by the end of 2013: • Formation of Working Group 3 • Launching Meeting • Identifying the causes and writing of the descriptive document • Identification and prioritization of training needs Component 2: budget and tasks for 2013

  13. Discussions

  14. Component 3 • Products • Organisation of and participation to scientific exchange events • Workshops and trainings funded through a regional exchange principle • Joint Publications

  15. Component 3 • Products • Study on existing models in terms of the goal of developing a tool for decision support • Additional data collected • Study on French Guiana position in REDD+ • Consolidation of a database to feed the model • Tool to help decision-making process • Handbook for the tool use • Presentation material on the tool

  16. Until now: • Snapshot of component 3 To be completed by the end of 2013: • Preparation of a study for the critical review of existing models • Establishment of doctoral student and PhD team Component 3: budget and tasks for 2013

  17. Discussion

  18. Component 4 • Products • Project Manager • Administrative Assistant • Backstopping ONFI • ONF French Guiana supervision • Steering Committees • Project team costs (ONFI and ONF-FG) • Translation / editing (documents and simultaneous) • Administration • Operation of the country focal points

  19. Component 4: budget for 2013

  20. Until now: • Implementation of the project team (recruitment, purchase of equipment, training of focal points) • Establishment of project governance (identification by the political partners, technical and political focal points in the countries, draft MoU) • Elaboration of the Programme of Work • Organization launching Steering Committee • Visit to the countries • Preparation of a communication document on the project (in several languages​​) • Reporting to the donors To be completed by the end of 2013: • Second Steering Committee • Implementation and monitoring of programme of work Component 4: budget and tasks for 2013

  21. To be validated during this SC • Programme of work • Main orientation to be validated bearing in mind the likely re-orientations followingthe WG first meetings • Budget to be committed until end 2013 (donors) • Approach to launch and implement studies • Constitution of working groups • PhD thesisToRs • Focal Point ToRs

  22. Approach to launch and implement studies • 5 studies to be performed by a contractor • On forest cover monitoring • On forest carbon stocks • On deforestation/degradation causes • On existing models • On French Guiana specific position • ToRs prepared by the project team • Submitted to SC • Restricted invitation to tender (list to be defined by SC) • Selection of the contractor by the project team • Request for non-objection by the SC

  23. Working groups constitution • 3 working groups will be created • On forest cover monitoring • On forest carbon stocks • On deforestation/degradation causes • Lead by countries or technical/scientific partners • Facilitation by the project team • 15 to 20 members from all countries (to be nominated by countries) • Civil Society on WG 3 (deforestation/degradation)

  24. Focal Points Terms of References Host Organisation Provides: Volunteer Primary Tasks: • Provide a functional office space (with internet, phone and printer access). • Regular supervision and keep International Volunteer in loop of day-to-day information and invite to attend relevant meetings. • Support the integration of the International Volunteer in national REDD+ networks and contexts outside of the host organization. • Suggest additional task and responsibilities that could help the country in the project achievment • Support and promote opportunities for respective host organization and host country/state to actively benefit from participation project. • Identify, gather and synthesize information about emerging and ongoing REDD+ initiatives in their host country/state, in line with the 3 principal activities • Facilitating technical exchange and collaboration between multiple stakeholders. • Support strengthening communication and coordination between project partners

  25. Focal Points Terms of References Host Organisation Provides: Volunteer Primary Tasks: • Provide a functional office space (with internet, phone and printer access). • Regular supervision and keep International Volunteer in loop of day-to-day information and invite to attend relevant meetings. • Support the integration of the International Volunteer in national REDD+ networks and contexts outside of the host organization. • Suggest additional task and responsibilities that could help the country in the project achievment • Support and promote opportunities for respective host organization and host country/state to actively benefit from participation project. • Identify, gather and synthesize information about emerging and ongoing REDD+ initiatives in their host country/state, in line with the 3 principal activities • Facilitating technical exchange and collaboration between multiple stakeholders. • Support strengthening communication and coordination between project partners

  26. To be validated during this SC • Programme of work • Main orientation to be validated bearing in mind the likely re-orientations followingthe WG first meetings • Budget to be committed until end 2013 • Approach to launch and implement studies • Constitution of working groups • Focal Point ToRs • PhD thesisToRs

  27. MERCI /THANK YOU /DANK U / OBRIGADO marie.calmel@onf.fr www.onfinternational.org Photo credit: ONF Guyane