1 / 46

AHLTA / EHR Way Forward: PART 1 – AHLTA and AHLTA Service Pack 1 PART 2 – EHR Way Forward

AHLTA / EHR Way Forward: PART 1 – AHLTA and AHLTA Service Pack 1 PART 2 – EHR Way Forward. Presented by: CAPT Robert Marshall, MD MPH MISM Chief Medical Informatics Officer, BUMED M6 Robert L. Flores AHLTA Program Manager, NAVMISSA. Learning Objectives.

Download Presentation

AHLTA / EHR Way Forward: PART 1 – AHLTA and AHLTA Service Pack 1 PART 2 – EHR Way Forward

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AHLTA / EHR Way Forward:PART 1 – AHLTA and AHLTA Service Pack 1PART 2 – EHR Way Forward Presented by: CAPT Robert Marshall, MD MPH MISM Chief Medical Informatics Officer, BUMED M6 Robert L. Flores AHLTA Program Manager, NAVMISSA Leading NAVMED through PortfolioManagement.

  2. Learning Objectives • AHLTA – Making it work better for patient care • Describe MAPS and COMPASS programs • Discuss IT applications to help • Discuss workflow analysis and AHLTA • Discuss AHLTA training and trainers • Describe the AHLTA Triumvirate • Discuss Secure Messaging, iMedConsent and AHLTA

  3. Learning Objectives (cont) • AHLTA Service Pack 1 • Understand Service Pack 1 milestones • Beta test plans • Release management • Clinical Impact Analysis • Service Pack 1 Fixes and Updates • Release contents • Fixes and Changes • Release Tracking and Progress Reporting Leading NAVMED through PortfolioManagement. 3

  4. Learning Objectives (cont) • Deployment Plans • EUD Installation and Imaging • Reporting Process • Troubleshooting • Reporting processes • Information gathering and Lessons Learned • Communications and Coordination • Cross Discipline information sharing • Clinical User inclusion • Training and User Awareness Leading NAVMED through PortfolioManagement. 4

  5. Learning Objectives (cont) • EHR Way Forward • Planning – Past, Present and Future • EHRWF Tiger Teams review • Interagency (DoD/VA) planning – Before decision • Interagency (DoD/VA) planning – Post decision • Products • Original Analysis of Alternatives • Directed AoA • Working Teams/Executive Team recommendations • Expected Interagency EHR • Training and User Awareness Leading NAVMED through PortfolioManagement. 5

  6. AHLTA – Present State • Version 3.3 deployed to all Navy sites; all Army/Air Force sites by 12/31/2010 • Over 200 new and updated features – many not utilized; two turned off (aCPG and APV) • No major upgrades after SP1 released • Possible for major Medcin upgrade (SOO)

  7. MAPS and COMPASS • What they are • The forms that support these • Workflow analysis and Business Process Reengineering – why they are vital • WLAN – why it is critical to success • What does the Navy have? • What does the Navy need? • Dragon Naturally Speaking and AsUType • Tablets – PC, Android and iPad

  8. Secure Messaging and iMedConsent • Secure messaging - part of PCMH (Medical Home) • Web service – no Network or AHLTA interface • Copy and paste to document care • iMedConsent - a library of consent forms • Both for procedures and for advanced directives • Also has research consent forms for IRB’s • Web service – no Network or AHLTA interface • Is the VA’s consent library (integrated) • Favorites, print and scan

  9. AHLTA Training & Triumvirate • Sustainment training contract • Sustainment trainers/consultants • Navy AHLTA web site • Regional Trainers from TMA • Triumvirate • Consists of AHLTA trainer, Coder and Clinical Champion • Need Command support to help clinics use AHLTA better • Is a business/clinical process support asset

  10. AHLTA Training & Triumvirate • Sustainment training contract • Sustainment trainers/consultants • Navy AHLTA web site • Regional Trainers from TMA • Triumvirate • Consists of AHLTA trainer, Coder and Clinical Champion • Need Command support to help clinics use AHLTA better • Is a business/clinical process support asset

  11. AHLTA Service Pack 1 Leading NAVMED through PortfolioManagement. 11

  12. AHLTA Service Pack 1 • Service Pack 1 Milestones • Beta test plans • Clinical Impact Analysis • Release management

  13. AHLTA Service Pack 1 Milestones *All Dates and Milestones are subject to change

  14. AHLTA Service Pack 1 • BETA Testing • Plan includes testing by a representative site from each service • Groton NH • Goodfellow AFB • Brooks Army Medical Center

  15. AHLTA Service Pack 1 • BETA Test Plan • Users at the BETA sites using the software in live encounters • DHIMS will collect usage info from BETA teams • Testing on Windows 7 (32 bit) based EUDs for the first time in addition to Windows XP • Windows 7 STIG creation • DHIMS will certify SP1 for both platforms • Windows Vista will not be supported

  16. AHLTA Service Pack 1 • Clinical Impact Analysis • Plan includes analysis to be conducted on implications of SP1 changes • Clinical • Business and Data Quality

  17. AHLTA Service Pack 1 • Clinical Impact Analysis • TBD

  18. AHLTA Service Pack 1 • Clinical Impact Analysis • TBD • HIGHLIGHTS from the release notes will go here

  19. AHLTA Service Pack 1 • Clinical Impact Analysis • TBD • HIGHLIGHTS from the release notes will go here

  20. AHLTA Service Pack 1 • Data Quality Impact Analysis • TBD • HIGHLIGHTS from the release notes will go here

  21. AHLTA Service Pack 1 Data Quality Impact Analysis • TBD • HIGHLIGHTS from the release notes will go here

  22. AHLTA Service Pack 1 • Release Management • Plan will include multiple facets • Training Requirements • DHIMS has contracted to create training instruments • Information on the Release to be communicated • IT specific deployment plans and instructions • Information resulting from functional impact analysis efforts • Lessons learned from the BETA period

  23. AHLTA Service Pack 1 Release Management • IT Organizations will need to develop plans prior to the release • Magnitude of the SP1 code changes • Hundreds of fixes and thousands of code changes • Many modules have been completely re-written • Most massive update since 3.3 release • Deployment plans should include creating new Gold Image from scratch (i.e., complete fresh installation of OS , etc) • Re-imaging of EUDs is the deployment method sites should plan for • Re-imaging, while labor intensive and upsetting to the users, will pay dividends in minimizing long term support issues • Start preparing users for the process well in advance • Backing up users desktops, documents, etc. • Document printer settings, etc • Involve Clinical and Business/Data Quality managers in the process

  24. AHLTA Service Pack 1 • Service Pack 1 Fixes and Updates • Release contents and timetable • Beta Phases • Fixes and Changes • Changes to Infrastructure • SP1 A plans

  25. AHLTA Service Pack 1 Release Contents Pieces to be included in SP1 • Windows 7/XP Compatibility • CDR Stabilization – SQL Optimization (Integration effort) • Remove unused AHLTA components • Oracle 10.2.0.5 (CDR) • Reflections 14.1

  26. AHLTA Service Pack 1 Deployment CDR Update 814 • Delivery CM (11/17) • DT&E Testing (11/22 – 11/29) • Fielding (12/18) 3.6 Mid-Tier Update • Delivery CM (12/3) • DT&E Testing (12/8 – 1/7) • Fielding • Groton (1/15) • Goodfellow (1/15) • AMEDD site (1/15) 3.6 Web Service Update • Delivery CM (12/3) • DT&E Testing (12/8 – 1/7) • Fielding • Groton (1/15) • Goodfellow (1/15) • BAMC(1/15)

  27. AHLTA Service Pack 1 Deployment ICD Update 469 • Delivery CM (12/3) • DT&E Testing (12/8 – 1/7) • Fielding • Groton (1/15) • Goodfellow (1/15) • AMEDD site (1/15) SP1 Client • Delivery CM (12/3) • DT&E Testing (12/15 – 1/15) Codes (CPT 6.0) • Delivery CM (1/21) • DT&E Testing (1/24 – 1/28)

  28. AHLTA Service Pack 1 BETA Phases Phase 1: Beta Tester (1/17 – 2/4) Phase 2: Provider (2/7 – 2/25)cannot start until CPT dates • Small group: includes codes and SP1A SP1A (will happen between Phase 2 and 3)code fix of any bugs found in beta testing) Phase 3: Full Clinic (2/28 – 3/18) Phase 4: Full site deployment (3/21 – 4/8)

  29. AHLTA Service Pack 1 • Troubleshooting • Deployment processes • Procedures during Rollout • Reporting • Information gathering and Lessons Learned • Communication plans • Sharing of lessons learned

  30. AHLTA Service Pack 1 General Escalation Plan • Successful completion of milestones will be reported and tracked • Written communications primary means • MHS Help tickets to be used to report problems during testing or deployment • The word “BETA” must appear in the ticket title

  31. AHLTA Service Pack 1 Mitigation Roll Back / Deployment • Sites need to have a Roll Back plan • Beta testing, DT&E approval and a staggered implementation does not guarantee a problem won’t appear • Sites should minimize risk where possible • E.g., Monitor results of testing and BETA progress, internal testing, staggered rollouts Hope for the best but plan for the worst!

  32. AHLTA Service Pack 1 Communications • Beta Period • Scheduled conferences will be held weekly and as needed • Results of the Beta will be collated and communicated to the sites • Sites should follow the progress of the Beta and other information as they become available • “…if you’re not getting it, ASK for it!”

  33. AHLTA Service Pack 1 Coordination • Communications and Coordination at the local level • Training and User Awareness

  34. AHLTA Service Pack 1 Coordination Cross Discipline information sharing • Clinical User inclusion • Business Office/Coding inclusion • Use the Triumvirate process to get all stakeholders on board

  35. AHLTA Service Pack 1 Coordination • IT Managers should involve clinic managers, coders, and trainers when planning the deployment • Users need to be aware of what is coming and when • How to report issues • Who to go to for help • MHS Trouble Ticket processes • Disseminate Lessons Learned • Disseminate Impact Analysis • AHLTA Clinical Champions can help coordinate these efforts

  36. AHLTA Service Pack 1 Training • DHIMS has contracted to create training materials • Briefings and CBTs are expected • Site Deployment Plans should include training plans • Use ‘Triumvirate’ • Involve Clinic managers and Coding/Data Quality • Involve MTF leadership

  37. EHR Way Forward Leading NAVMED through PortfolioManagement. 37

  38. EHR Way Forward • Past Planning • JCIDS-driven AoA • Down selected to four options • >90 clinical and non-clinical Tiger Teams • Full engagement by all three Services • Pre-Decisional Interagency (DoD/VA) Planning • Driven by senior TMA leadership • Limited or no Service involvement initially • Multiple DoD/VA working groups

  39. EHR Way Forward (cont) • Post-Decisional Interagency Planning • Decision made in January for future direction • Decision was….. • Based on decision, planning did this…. • Future product expected to be…. • Timeline for implementation…. • Long term planning….

  40. Original/Interagency AoA • DoD AoA process • Choices made • Alignment with Interagency decision • Why things changed? • Interagency AoA work • Working groups • Mission Requirements and Performance Outcomes • Data Interoperability • Infrastructure and Enterprise Architecture • Systems Capabilities • Presentation Layer • Business Process

  41. What is next? • Outcomes of Interagency working groups – slides • Future end state • Timeline – separate slides • Data model – separate slides • Enterprise Service Bus/Data Access Layer – separate slides • Mid-tier – separate slides • Presentation layer – separate slides • Interoperability – separate slides • Nationwide Health Information Network - slides

  42. Click to edit Master title styleUse this two column slide for long lists of bullets • Click to edit Master text styles • Second level • Third level • Fourth level • Fifth level • Click to edit Master text styles • Second level • Third level • Fourth level • Fifth level Leading NAVMED through PortfolioManagement.

  43. Summary • Font is Arial – 26 pt at this level • Second level – 25.5 pt • Third level – 24 pt • Fourth level - 22.5 pt • Fifth level – 21 pt Leading NAVMED through PortfolioManagement. 43

  44. Contact Information • CAPT Robert C. Marshall, MD, MPH, MISM • robert.marshall@med.navy.mil • 253-225-1690 • Robert L. Flores • Robert.flores@med.navy.mil • 210-808-0789 Leading NAVMED through PortfolioManagement.

  45. Questions Leading NAVMED through PortfolioManagement. 45

  46. Once your Navy Days 11 presentation draft is complete, please follow the naming convention and version control instructions below:1. File name begins with Navy Days 11 plus the name of your session then the date of submission in a mm_dd_yyyy format then the word Draft, e.g., ND11_Fixing the World Via Powerpoint_11_15_2010_Draft.  2. Each time the draft is revised, a version number is added, e.g.,  ND11_Fixing the World Via Powerpoint_11_15_2010_Draft_V1; ND11_Fixing the World Via Powerpoint_11_15_2010_Draft_V2, etc. 3. When the final version of the presentation has been approved, replace the word Draft with Final.4. With any changes made to the Final, begin the versioning process at 1 again, e.g., ND11_Fixing the World Via Powerpoint_11_15_2010_Final; ND11_Fixing the World Via Powerpoint_11_15_2010_Final_V1.5. Save the file in MS Powerpoint 97-2003 and 2007 to accommodate the reviewers' operating systems.    Leading NAVMED through PortfolioManagement. 46

More Related