Interchange Distribution Calculator Working Group(IDCWG)Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17th , 2012
IDCWG Update • Meetings/Conference Calls • IDC Change Order Updates • GTL Update
Meetings/Conf Calls • March, CO 283/GTL Workshop– Not a formal IDCWG meeting – Calculation Testing • Conference Calls – April 4th, April 13th. • May 16 – 17th Atlanta GA (NERC) - BPS Joint Meeting • August 15th – 16th (MISO, St Paul) • October 16th (8 – 5) – 17th (8 – 12), Las Vegas (Customer Meeting)
Implemented • CO 317: Michigan PAR Status Change Switch. • CO 331: IDC Interface to NAESB Web Registry • CO 333: Include MF and NNL on TLR Event History Display • CO 338: Default Timing for TLR Levels 1 and 0 • CO 340: Effective Date on Market Coordinated Flowgates • CO 341: MISO and PJM ED6/7FN Transfer to IDC • SDX CO 08: Remaining GUI Changes • SDX CO 10: Change Filtering Options on Displays
Development/Testing • CO 322: PFV Generation Priority Submissions • Will be moved to development once a final methodology is reached at BPS. Will be revised as needed. • CO 330: Authorization of OATI Use of IDC Data for DOE Studies • CO 332: Changes to Manitoba EAR Tag in IDC • Approved for implementation - June 1st • CO 336: Changes to IDC Factor Calculation Timing • This will be moved for development if deemed need after an evaluation on the behavior of status changes is completed by IESO and MISO - Cancelled
Development/Testing • CO 346: TLR Auto Acknowledgment IDC will be modified in such a way that each sink impacted Reliability Coordinator can set up to automatically acknowledge the TLR actions based on configurable time intervals after a new TLR instance • CO 347: IDC TLR Data Request for New York Transmission Owners
DRAFT/Evaluation • CO 326: PFV Metrics • Maybe revised after a final methodology is reached at BPS. • CO 328: Intra Hour Tag Curtailment • IDCWG has proposed and approved for evaluation a different solution than previously drafted and evaluated.
IDCWG Update GTL Update
IDCWG Update Change Order 283 Status
IDCWG Update • During the GTL Workshop, OATI went over the calculation methodology of CO 283. • Certain calculation inconsistencies were identified and OATI is working on a fix. • Several GUI enhancements were identified and will be worked on once the final methodology is reached and work is resumed on IDCWG and OATI end on the project.
IDCWG Update • IDCWG is awaiting the whitepaper (methodology) to be made final, after which development of GTL Change Orders and the GTL application.