100 likes | 283 Views
PRODML SIG. Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston. General SIG Status. SIG Team Structure. Steering Committee Operations Team Use Case and Marketing Team Co-Chairs: Laurence Ormerod, (open) Specifications and Architecture Team
E N D
PRODML SIG Team and General SIG MeetingsOctober 13-14, 2009Schlumberger SIS Offices, Houston
SIG Team Structure • Steering Committee • Operations Team • Use Case and Marketing Team • Co-Chairs: Laurence Ormerod, (open) • Specifications and Architecture Team • Co-Chairs: Bill King and Bill McKenzie • Deployment Support Team • Co-Chairs: Duncan Ord, (open) • Energistics • Alan, Gary, Jana, and Robin [from PDS]
PRODML Implementation Demos The next slide illustrates the Distributed Temperature Survey demonstration. Other current demonstrations are Shell’s automated well test validation demo, Chevron/Moblize’s integrated demo of WITSML and PRODML Standards, and Pioneer’s asset team production monitoring interface demo.
Shell 2009: V2.0 Services, Proof of Concept Distributed Temperature Reconciliation Workflow automation (above) Orchestration (right) Sequence diagram (left)
Gas Lift Design Representative Workflow Laurence Ormerod, Weatherford
Gas Lift Design Process Outline GL Design – uses installed mandrel depths, spec. valves GL Co may specify Valves Installed by slickline. Well operating Installation, with Blank GL mandrels Depth “as installed” Completion Co. Completion Design: tubulars and GL valve depths variables GL Co may advise Drill well: Results inform completion design Valve Design ? Known √ ?