1 / 5

Battery Energy Storage Workshop Wholesale Storage Load (WSL) April 23, 2019

Battery Energy Storage Workshop Wholesale Storage Load (WSL) April 23, 2019. WSL Treatment – Where We Are Today. Storage device (battery in this discussion) must be registered with ERCOT as a Generation Resource and Load Resource

Download Presentation

Battery Energy Storage Workshop Wholesale Storage Load (WSL) April 23, 2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Battery Energy Storage Workshop Wholesale Storage Load (WSL) April 23, 2019

  2. WSL Treatment – Where We Are Today • Storage device (battery in this discussion) must be registered with ERCOT as a Generation Resource and Load Resource • EPS Metering Design Proposal must support the request for WSL treatment • WSL must be separately metered from all other facilities, including auxiliary facilities • Stored energy must be re-generated and sold at wholesale as energy or ancillary services

  3. WSL Treatment Requests and Approval • Entities contemplating WSL treatment of battery charging should visit with metering groups at ERCOT and the interconnecting TDSP early in the process.  • Detailed drawings illustrating the connectivity for the storage facility will be required for review. • It is recommended that discussions occur prior to beginning construction to identify any issues with the electrical connectivity of the proposed construction plan. • Early discussions will help identify any issues and allow for plans to be modified as needed prior to beginning construction

  4. WSL Eligibility Questions - PUN and SOG • Generation Resource in a PUN • Should WSL treatment implementation extend to batteries that can self-serve PUN Load with the stored energy? • If yes, is there a method to ensure that stored energy is re-generated and sold at wholesale as energy or ancillary services? • Settlement Only Generator • Should WSL treatment implementation extend to non-dispatched generators? • If yes, should there be differentiation between a SOG that is co-located with customer load and one that only has auxiliary loads behind the metering point?

  5. Battery with DC Integration – WSL Questions • DC integration of battery and solar • Should WSL treatment implementation extend to DC integrated units? • If yes, does this require DC metering so WSL is separately metered from all other facilities, including auxiliary facilities? • ANSI does not currently have an approved standard covering DC Meters or associated DC metering devices. • Impacts to TDSPs in ERCOT for DC meter testing and certification • If yes, should the WSL metering be located on the AC side of the inverter with the understanding that all auxiliary loads must be connected above the metering point.   • This will result in WSL treatment for all energy requirements of the solar inverters when energy is flowing into the inverters through the metering point.

More Related