An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cleaner production • Considers your • Technologies • Employees • Raw materials • Processes • Emissions • Partners and • Products

  2. Elements of a CP-project • Data collection Mass flow Energy flow Costs and safety • Reflection: Where and why do we generate waste? • Option generation • Feasibility • Implementation • Controlling, continuation, EMS

  3. Common waste treatment: Waste is generated! What’sthat got to do with me? Cleaner production: Waste is generated! Where does it come from?

  4. OBSERVED SYSTEM PRODUCTS Primary and secondary MATERIAL EMISSIONS • ENERGY CARRIERS • Fuels, e.g. gas, oil, coal Solid waste, gases, wastewater • ENERGY • Mass free, e.g. electricity or district heating • ENERGETIC • EMISSIONS • Waste heat, noise • MATERIAL • Raw material, process material, other material

  5. No Waste or liquid or gaseous Annual Unit Purchasing cost Disposal cost Total cost emissions q uantity 1 Waste water 180,000 m³ 6 10 2,880,000 2 Spent grain (wet) 5,000 t around 800 - 350 - 1,750,000 (2,250,000) 3 Malt dust 447 t 4,000 ? 1,788,000 4 Wast e barley 220 t 4,000 ? 880,000 5 Bottoms 30 t - 250 7,500 6 Glass/broken glass 92 t 2,400 350 253,000 7 Plastic containers 18 t 10,000 2,000 216,000 8 Labels (wet) 50 t 30/1000 pcs 600 3,600,000 30,000 9 Cardboard / paper 35 t 5,000 - 175,000 10 Wood pallets 24 t 6,000 40 144,960 11 Plastic film 1.5 t 22,000 4,500 39,750 12 Industrial waste 104 t ? 800 83,200 13 D iatomaceous earth 45 t 8,000 930 401,850 14 Waste from maintenance, 200 kg ? 11 2,200 greasy 15 Contents of oil separator 3,200 kg ? 2. 8 8,960 16 Waste oil 1,000 kg 50 2 52,000 17 Waste paints 50 kg 100 15 5,750 18 Fluorescent lamps 20 kg 120 12 2,640 19 Accumulators 25 kg 70 2.8 1,820 20 Waste gas, steam boiler 1,000,000 m³ - - -

  6. Reasons for an environmental team • Becausethere are many different departments/machines in a company, it is difficult to get the necessary overview and the detailed technological knowledge. • Becausethere are motivated and competent employees in a company. • Becauseas a TEAM – with a common goal – it is possible to work more efficiently than a lone ranger. Gather people from differnet departments: production, maintenance, technology, purchasing, management, quality, accounting, research and development, environment, health and safety, legal branch, etc.

  7. Material flow analysis Sankey-diagram: www.sankeyeditor.net

  8. Material flow analysisDetailed description of the material and energy use • Which waste and emission streams are generated? • Which raw materials are lost? • Where and why does this happen? • Where are the weak points? • Where are potentials for improvement? • Which materials can be reused?

  9. Within the production process, there are many points where materials and energy are lost. • These points are also environmental and economic weak points. • A material flowanalysis identifies the points where materials are lost and their amount.

  10. A comparison with the best available technology shows process weaknesses. • The material flow analysis facilitates the evaluation of the "production costs" of waste and emissions. • Eco-efficiency:the best use of materials reduces emissions.

  11. Strategies for cleaner production

  12. Product change • Substitute the product • Increase the product life-time • Change the materials • Change the product design • Use recycled materials • Avoid critical components

  13. Good housekeeping • Improve information • Change dosage/concentration • Increase the utilization of process capacities • Check cleaning and maintenance period • Foster standardization/automation • Improve purchasing, storage and distribution • Carry out a material flow analysis

  14. Waste logistics Separation of waste and wastewater to • Set up closed cycles • Facilitate recovery and re-utilization • Minimize quantities of hazardous waste • Minimize disposal costs • Minimize cleaning expenses (wastewater, exhaust gases, etc.)

  15. Technological modification • Substitute thermo-chemical processes by mechanical alternatives • Use countercurrent cascades instead of single-static rinse techniques • Manage separate waste and wastewater streams • Improve process conditions • Foster recovery and reuse of materials • Increase life time of chemicals/materials • Reduce the infiltration of impurities • Ensure airtight sealing of equipment

  16. Energy efficiencyTypical areas of improvement • Cooling/refrigeration • Heating • Compressed air • Insulation • Heat recovery • Separation processes • Lighting • ...

  17. Internal recycling • Reuse materials (solvents, etc.) • Reuse materials for different purposes (paper, solvents for lower-quality use, e.g. pre-cleaning, etc.) • Close internal loops (water) • Use returnable systems (packaging materials) • Reclaim materials with high value

  18. ECOPROFIT Graz 2000Realized and planned options In total 594 options, thereof: 60 %; 355 = realized options 2000 40 %; 240 = planned options 2001

  19. Anodizing company • Use of spray rinses • Reconstruction of water pipes • Longer drag-out time • Daily check • Reduction in water consumption by 46% (14,000 m³)

  20. Car repair shop • Installation of an ultrafiltration unit • Modified cleaning equipment • Saving of washing agent by 76 %, of water by 80 %