1 / 3

PROTON JISHUKEN CONFERENCE ON 15 th February 2008 FOR PART NAME: TYRE 195/60 R15 88H PART NUMBER: PW824308 MODEL : NE

PROTON JISHUKEN CONFERENCE ON 15 th February 2008 FOR PART NAME: TYRE 195/60 R15 88H PART NUMBER: PW824308 MODEL : NEW SEDAN & GXMC3. PRESENTED BY: EASY TBM GROUP CST AS Group Motto: Strive For Excellence Project Theme: Quality Without Compromise. WHERE. 5W + 1H FOR OVERALL PROJECT.

efrat
Download Presentation

PROTON JISHUKEN CONFERENCE ON 15 th February 2008 FOR PART NAME: TYRE 195/60 R15 88H PART NUMBER: PW824308 MODEL : NE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROTON JISHUKEN CONFERENCE ON 15th February 2008 FOR PART NAME: TYRE 195/60 R15 88HPART NUMBER: PW824308MODEL : NEW SEDAN & GXMC3 PRESENTED BY: EASY TBM GROUP CST AS Group Motto: Strive For Excellence Project Theme: Quality Without Compromise

  2. WHERE 5W + 1H FOR OVERALL PROJECT Problem Statement Our problem is the air trapped between sidewall rubber and casing NG WHAT Tyre blister in sidewall Poor stitching process WHY WHEN During Building process (sidewall stitcher) Sidewall Blister Curing Inspection Grader - Quality Management WHO Final Finish – Tyre Inspector WHERE Off standard Catalogue - max. 5 blisters more than 6 mm  HOW WHEN Stitcher condition @ TBM PFMEA û MATERIAL MACHINE MANAGEMENT Inappropriate sidewall profile Low Pressure = NG Wrong pressure used Air trapped in sidewall Analysis Poor workmanship Wrong setting S/Wall Stitcher METHOD MAN

  3. Solution Process Flow after countermeasure OK • Daily inspection of Stitcher Pressure condition at Building process. Countermeasure done/plan for each major contributor Previous jishuken problem(s) monitoring histogram (3mth per prob.) NG • 2G @ Tyre Building during assembly process. • New Stitchting Pressure Digital Control at TBM • Standardized Stitching Pressure û ü RM2652.00 Ave. for 2 mth scrap RM390.00 Nov. 07 Jan 08 Close monitoring (> 3days) histogram Dec. 07 Monitoring in Jan 08 (Total Scrap = 6pcs) 3pcs scrap come from 3# machine Cost of kaizen From Nov 07 till Jan 08 scrap improvement, we manage to reduced cost of scrap tyre up to RM 2260.00 /month.

More Related