1 / 8

PEP-II MAC Highlights

PEP-II MAC Highlights. John Seeman. 1.2 x 10 34. Vacuum issues. John Seeman. Future PEP-II Overall Parameters and Goals. 4 times design. 7 times design. John Seeman. PEP-II Upgrades. Goal: A factor of two in PEP-II luminosity (1.2  2 x10 34 /cm 2 /s) will come from:

efuru
Download Presentation

PEP-II MAC Highlights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEP-II MAC Highlights Frank Zimmermann, RLC 07.11.2006

  2. John Seeman 1.2 x 1034 Vacuum issues Frank Zimmermann, RLC 07.11.2006

  3. John Seeman Future PEP-II Overall Parameters and Goals 4 times design 7 times design

  4. John Seeman PEP-II Upgrades • Goal: A factor of two in PEP-II luminosity • (1.2  2 x1034/cm2/s) will come from: • Increasing each beam current by 40%. • Lowering by* from 11 to 8.5 mm giving 20%. • Increasing the beam-beam parameters by10%. • Keeping detector backgrounds at the predicted levels. • Maintaining (and improving) accelerator reliability. Frank Zimmermann, RLC 07.11.2006

  5. x DAFNE Upgrade with Large Piwinski Angle & Crab Waist bY Pantaleo Raimondi e- e+ 2Sx/q Vertical waist has to be a function of x: Z=0 for particles at –sx(- sx/2q at low current) Z= sx/q for particles at + sx(sx/2q at low current) Crabbed waist realized with a sextupole in phase with the IP in X and at p/2 in Y q 2Sz*q z 2Sz 2Sx Crabbed waist removes bb betratron coupling Introduced by the crossing angle Frank Zimmermann, RLC 07.11.2006

  6. Makoto Tobiyama Normal movement of KEKB chambers due to rapid change of beam current Beam Abort Cooling Beam Injection Frank Zimmermann, RLC 07.11.2006

  7. Makoto Tobiyama Measurements by dial gauge 2006.06.02 - 06.07 e-beam +:outside、-:inside +0.43 -0.72 +0.13 -0 +0.55 -1.02 +0.27 -0 +1.9 -0.21 +0 -0 +0.02 -0 +0.08 -0.01 +0.47 -0.23 +0.49 -1.81 +0.48 -1.22 +0.28 -0.16 x1 B2E.95 QF6E.21 QD5E.42 QEAE.42 QF4E.35 QD3E.35 QD1E.21 B2E.96 QF2E.41 +0.26 -0.02 +0 -0 +0.15 -0.14 +0.25 -0.83 +0.48 -1.75 +0.45 -0.13 +0.58 -1.83 +1.32 -0.53 +1.55 -0.76 +0.16 -0 +0.48 -1.86 x2+1 QD1E.20 QF2E.40 B2E.93 QD3E.34 QF4E.34 QEAE.41 B2E.94 QF6E.21 QD5E.41 Large movement:Both sides of B-chamber、Long-Q-chamber+BPM Frank Zimmermann, RLC 07.11.2006

  8. Move to Test Stand for Cool-down & High Power Test Makoto Tobiyama K. Hosoyama, et al

More Related