JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD 05-01 6 – 7 APRIL 2005 RONALD S. KANE APTU, CECOM SEC (732) 532-5330 DSN 992-5330 ronald.kane@us.army.mil. JOINT TDL CERTIFICATION TESTING. FISCAL YEAR 2004
E N D
JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD 05-01 6 – 7 APRIL 2005 RONALD S. KANE APTU, CECOM SEC (732) 532-5330 DSN 992-5330 ronald.kane@us.army.mil
JOINT TDL CERTIFICATION TESTING FISCAL YEAR 2004 • APTU PARTICIPATED/MONITORED FIVE JOINT CERTIFICATION TESTS • THIRTEEN SYSTEMS WERE TESTED INCLUDING THREE US ARMY SYSTEMS • FAAD C2I; JU; JIT03-09, PASS; JIT04-03, FAIL • M3P (JTAGS); JU; JIT04-03, PASS • APTU PERFORMED SCT PRIOR TO JIT • JOINT ADSI; JU; JIT04-01, FAIL; JIT04-03, PASS • APTU PERFORMED DEVELOPMENTAL TESTING WITH APC IN FEB – MAR 2003 • APTU REPRESENTED THE ARMY AT FIVE JOINT ANALYSIS REVIEW PANEL MEETINGS • IDENTIFIED 245 VIOLATIONS OF THE MIL-STDS • MADE CERTIFICATION RECOMMENDATIONS (VOTED) ON ALL SYSTEMS UNDER TEST
JOINT TDL CERTIFICATION TESTING FISCAL YEAR 2005 • APTU PARTICIPATED/MONITORED TWO JOINT CERTIFICATION TESTS • TEN SYSTEMS WERE TESTED INCLUDING THREE US ARMY SYSTEMS • FAAD C2I; JU; JIT04-06, PASS • TAIS AND AWS (LAPTOP VERSION OF TAIS); JU, PU, RU (RX ONLY); JIT05-01, PASS • APTU PERFORMED LINK-11/11B/16 SCT PRIOR TO JIT • JITC ACCEPTED APTU RECOMMENDATIONS FOR CERTIFICATION OF LINK-11/11B • LINK-16 TESTED DURING JIT • APTU REPRESENTED THE ARMY AT TWO JOINT ANALYSIS REVIEW PANEL MEETINGS • IDENTIFIED 93 VIOLATIONS OF THE MIL-STDS • MADE CERTIFICATION RECOMMENDATIONS (VOTED) ON ALL SYSTEMS UNDER TEST • JIT 05-02 CANCELLED DUE TO NETWORK MIGRATION • NEXT SCHEDULED TEST IS JIT 05-03, 16 MAY 2005 • FAAD C2I, RU, UNDER TEST
JOINT TDL CERTIFICATION TESTING DEFENSE INFORMATION SYSTEMS NETWORK LEADING EDGE SERVICES (DISN LES) • JITC MANDATED MIGRATION TO THE DISN LES FOR JOINT TDL CERTIFICATION TESTING • DISN LES IS AN ASYNCHRONOUS TRANSFER MODE (ATM) BACKBONE NETWORK • INCREASED SPEED, ACCURACY AND RELIABLITY OF VOICE AND DATA • APTU WILL NOT HAVE LINK-11 CAPABILITY • CURRENTLY RESEARCHING SYSTEMS TO PROVIDE CAPABILITY • APTU HAS THE DISN LES INSTALLED ON SITE • CURRENTLY UNDERGOING THE CERTIFICATION AND ACCREDITATION PROCESS • DISN LES WILL BE USED DURING NEXT TEST, JIT 05-03