1 / 3

JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD

JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD 6 – 7 OCTOBER 2005. Presented by: RONALD S. KANE APTU, CECOM SEC/SED Phone: (732) 427-2788/DSN 987-2877 Email: ronald.kane@us.army.mil. JOINT TDL CERTIFICATION TESTING. DEFENSE INFORMATION SYSTEMS NETWORK

Download Presentation

JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JOINT TACTICAL DATA LINK CERTIFICATION TESTING ARMY CONFIGURATION CONTROL BOARD 6 – 7 OCTOBER 2005 Presented by: RONALD S. KANE APTU, CECOM SEC/SED Phone: (732) 427-2788/DSN 987-2877 Email: ronald.kane@us.army.mil

  2. JOINT TDL CERTIFICATION TESTING DEFENSE INFORMATION SYSTEMS NETWORK LEADING EDGE SERVICES (DISN LES) • JITC MANDATED MIGRATION TO THE DISN LES FOR JOINT TDL CERTIFICATION TESTING • DISN LES IS AN ASYNCHRONOUS TRANSFER MODE (ATM) BACKBONE NETWORK • INCREASED SPEED, ACCURACY AND RELIABLITY OF VOICE AND DATA • APTU DOES NOT HAVE LINK-11 CAPABILITY • IN THE PROCESS OF PURCHASING A COMMON CONNECTIVITY DEVICE (CCD) TO PROVIDE LINK-11 AND LINK-16 CONNECTIVITY • APTU HAS THE DISN LES INSTALLED ON SITE • CURRENTLY OPERATING ON AN IATO • ISSUE OF FULL ATO PENDING EQUIPMENT UPGRADES • DISN LES USED STARTING WITH TEST JIT 05-03 • ENBALED MORE DIVERSE TESTING OF SYSTEMS ACROSS LINKS • SEPARATE VLANS SET UP FOR EACH LINK

  3. JOINT TDL CERTIFICATION TESTING UPDATE SINCE APRIL 2005 ACCB • APTU PARTICIPATED/MONITORED THREE JOINT CERTIFICATION TESTS • TWENTY SYSTEMS WERE TESTED INCLUDING TWO US ARMY SYSTEMS AND THE JRE/JTEP SYSTEMS • FAAD C2I; RU; JIT05-03, FAIL • WITHDREW FROM JIT05-05 TO WORK ISSUES • JOINT ADSI V12.3: FJU; JIT05-05, CURRENTLY UNDER TEST • TESTING OF JREAP INTERFACES (MIL-STD-3011) • APTU REPRESENTED THE ARMY AT TWO JOINT ANALYSIS REVIEW PANEL MEETINGS • IDENTIFIED 133 VIOLATIONS OF THE MIL-STDS • MADE CERTIFICATION RECOMMENDATIONS (VOTED) ON ALL SYSTEMS UNDER TEST • WILL ATTEND JARP FOR CURRENT TEST, JIT 05-05, ON 15 NOV 2005 • APTU PARTICIPATED/MONITORED THREE COMBINED INTEROPERABILITY TESTS • CONDUCTED IN CONJUNCTION WITH JIT • AUSTRALIA ANZAC SHIP, PU, CIT 05-03 • JAPAN AWACS, JU, CIT 05-04 • KOREA NTDS, PU, CIT 05-05

More Related