210 likes | 440 Views
EETD Environmental Health and Safety Monthly Metrics June, 2014. EETD Accidents- 6/14. EETD Accidents- By Type. EETD Accidents- Severity. Emergency Incidents- 6/14. Ergonomic Assessments- By Month. Open EETD Ergonomic Assessments. EETD Job Hazard Analysis (JHA)- Pending.
E N D
EETD Environmental Health and Safety Monthly Metrics June, 2014
EETD Job Hazard Analysis (JHA)- Pending New Hire vs. Expired Metric Started Sep ‘13
EETD Incomplete Training Assignments * Does not include SEC0203 “External Monitoring” Notice
Incomplete Training by Course Type(Total Incomplete Assignments = 81)
Training Assignments Due (Total = 81) Open Assignments by Dept. Open Assignments by Hire Date
Significant Safety Achievements- 6/14 • The Division Director Safety Walkthrough of Buildings 62 and 70 was completed. A summary report was prepared. • The City of Berkeley conducted a hazardous waste generator inspection of the Building 70 lab areas. • A FLEXLAB roof access procedure was completed. Restricted access signs were posted. • The Chemical Management System (CMS) self-assessment project has started. Several labs areas are being checked and a survey was sent out to PI’s. • EETD Safety Alerts were issued for: • Nitric Acid waste treatment procedures • Use of dust mask respirators • A number of old gas cylinders were removed from the Building 70 cage. An old chemical clean-out was completed in 70-226.
Short Term Safety Outlook- 6/14 • Continue to assist with start-up of the new FLEXLAB buildings. • Complete the Chemical Management System (CMS) self-assessment project. • Complete participation in the inter-divisional “off-site safety” self-assessment project. • Complete the flame retardant lab coat corrective action. • Begin the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for EETD. • Address the European electrical appliance approval issue in the B31 test chamber. • Develop FLEXLAB user safety orientation training. • Develop area safety lead orientation training. • Conduct a quarterly SAA inspection of EETD lab areas.