RHIC Heavy Ion Operations THE RHIC TEAM Brookhaven National Lab LHC-LUMI-2005 Arcidosso

This report highlights the successful operation and optimization of RHIC's Run-5 Cu-Cu heavy ion collisions, including accurate luminosity predictions, beta squeeze improvements, and in-run intensity optimization. It also discusses excellent machine availability, weekly luminosity and physics time, and the overall 5-year performance of RHIC.

ekettler
Download Presentation

RHIC Heavy Ion Operations THE RHIC TEAM Brookhaven National Lab LHC-LUMI-2005 Arcidosso

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Heavy Ion OperationsTHE RHIC TEAMBrookhaven National LabLHC-LUMI-2005Arcidosso

  2. Run-5 Cu-Cu Integrated Luminosity RHIC Run 5 Delivered s= 200 GeV/uCu-Cu Luminosity b*=0.85m (0.89m) • Accurate average luminosity prediction (8x1027 cm-2 s-1) and slope projections • Beta squeeze from 1m to 0.85 m (measured 1.1 m to 0.89 m) • In-run optimization of intensity and number of bunches b*=2.6m b*=3.0m (calendar) time at store: 53% Cu-Cu ZDC cross section measured at 2.6 barn

  3. RHIC Availability and Time in Store Excellent availability (82%) despite very complex operational modes. Machine setup time reduced to 2.5 weeks. Time in store (53%) comparable to successful Au-Au Run-4 run Goal is 60% time in store

  4. Weekly Cu-Cu Luminosity and Physics Time Run5 Cu-Cu 100 GeV Delivered Integrated Luminosity by Week 101 hours/week is 60% calender time in store

  5. Turn-Around-Time (TAT) Run5 Cu-Cu (s=200 GeV) Average: 75 minutes between physics stores Blizzard Equiment failures Power dips Experiment accesses Pressure rise Permit pulls Quench link interlocks Turn-around-time: Beam dump to next declaration of physics store

  6. 5-Year RHIC Performance Nucleon-pair luminosity A1A2L delivered to PHENIX HI Luminosity exceeding design in three years

  7. RHIC HI Achieved and Planned Parameters For s=200 GeV/n Au-Au, the enhanced luminosity goal (c. 2008, before electron cooling) is Lstore ave = 8x1026 cm-2 s-1 4x design 2x achieved