1 / 13

PTC-ORBIT code for LHC injectors … current status …

PTC-ORBIT code for LHC injectors … current status …. Alexander Molodozhentsev (KEK) December 8, 2011. CERN: Space Charge Group Meeting#7 / ICE / BE-ABP. PTC-ORBIT structure … v.10122011. MADX(PTC)  lattice description (STATIC)  PTC-FLAT-FILE should be produced … PTC-ORBIT(MPI)

elaine-key
Download Presentation

PTC-ORBIT code for LHC injectors … current status …

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PTC-ORBIT code for LHC injectors… current status … Alexander Molodozhentsev (KEK) December 8, 2011 CERN: Space Charge Group Meeting#7 / ICE / BE-ABP

  2. PTC-ORBIT structure … v.10122011 • MADX(PTC)  lattice description (STATIC)  PTC-FLAT-FILE should be produced … • PTC-ORBIT(MPI)  ORBIT script  TIME tables for the each (any) elements of machine  Activate ‘TIME-dependence’ … ‘DYNAMIC’ lattice  6D particle distribution  SpaceCharge ORBIT module … + Diagnostic  … TRACKING procedure

  3. PTC-ORBIT status… v.10122011 • CERN cluster: • PTC-ORBIT(MPI) has been installed and compiled … • Path to the executable file (lxplus.cern.ch): /afs/cern.ch/project/lhcnap/nap2/user/amolodoz/CODES/ START-PTC101211-ORBIT10-xe11.2.137 • Examples: CERN PS Booster /afs/cern.ch/project/lhcnap/nap2/user/amolodoz/RUNS/2011/November/PSB/Chicane_RF/12-01-11/FK-Chicane-RF-Basic  … available through the ‘CERN Space Charge Group’ home-page CERN PS /afs/cern.ch/project/lhcnap/nap2/user/amolodoz/RUNS/2011/November/PS/Chicane/12-05-11/NO-RFTable • Training (period: Nov.28 – Dec.7) PSB  7h / PS  4h / SPS  2h

  4. PTC … & PTC-ORBIT … • … /afs/cern.ch/project/lhcnap/nap2/user/amolodoz/RUNS/2011/November/PTC-About PTC report … KEK2002 PTC-ORBIT report … KEK 2007

  5. CERN PS booster … part of the PSB lattice Chicane+FastKickers + RFsystem CHICANE Bump Magnets • DYNAMIC variation of the magnets • RF Table with the 2nd harmonic

  6. CERN PS Booster: BS_ramp.TXT Particle tracking with the initial time of 0 msec 2 1 1 1 0.0 0.17824890 0.0 0.0005 0.000 0.0 ‘Chicane’ bump variation 0.5msec ‘Fast’ kickers variation PTC-ORBIT Particle tracking with the initial time of 1msec

  7. CERN PS Booster: RF test … RF Table V1 = 8 kV V2 = 24 kV RF Table (example) … RF_DOUBLEHARM_NOACC.TXT 2 1 1 0 2 1 2 0.0 0.1600 -0.008 0.0 0.024 0.0 0.010 0.1600 -0.008 0.0 0.024 0.0 PTC-ORBIT Single particle tracking … phi0=3.0rad / dW=0.0GeV

  8. CERN PS Booster:‘shot-term’ plan till Dec.15, 2011 (with Michel Martini) • 6D multi -particle tracking by PTC-ORBIT (obtained after the MT injection process …) • … NO Space charge … effect of the chicane on the transverse emittance of the beam … basic beam diagnostic … • … Introduce the ‘Space Charge’ module of the code … … ‘first touch’ of the task …

  9. CERN PS … injection chicane PS$START (beginning of lattice): PI.BSM40 PI.BSM43 … COD at PI.BSM42 Maximum strength of {BSM} PI.BSM42 PI.BSM44

  10. CERN PS … DYNAMIC chicane variation  Variation of COD at RNG$START ‘Realistic’ time tables of each BSM … prepared by S.Gilardoni (May2011) Observation: RNG$START PTC-ORBIT

  11. CERN PS … DYNAMIC chicane variation PS RF system … fundamental harmonic Phi=0, dE=0 Phi=2.8 rad, dE=0 PTC-ORBIT Effect of the chicane (‘path length’ variation) …

  12. CERN PS:‘shot-term’ plan till Dec.15, 2011 (with Raymond Wasef) • Single particle tracking using the existing machine description  ‘pole winding’  high-order field components …  ‘chicane’ effect … distortion the machine super-periodicity Expected result: tune-scanning and the ‘beam-survival’ study (with the realistic physical aperture) • 6D multi -particle tracking by PTC-ORBIT (obtained after the MT injection process …) • … NO Space charge ( 2000 turns  … >> NSYNCH) … the dilution of the transverse emittance of the beam (vz working point) … basic beam diagnostic … • … Introduce the ‘Space Charge’ module of the code … … ‘first touch’ of the task …

  13. CERN SPS • … make it running …

More Related