An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Irrigation Update:Canterbury Region Brett Painter April 2014

  2. Hurunui-Waiau AIC/NTP 35,000 + <10,000 ha ?? ? storage + <12,000 ha HWP <250 Mm3 storage + <58,500 ha

  3. Waimakariri-Ashley WIL/NTP/PR 8+on farm+?? Mm3 storage 35,000 + <15,000 ha + reliability

  4. Rakaia-Waimakariri TP. 100-200+ Mm3 p.a. via canal & river CPW ? storage +40,000 ha TP/CPW/RDR/BCI Connecting infrastructure Existing 100,000 ha

  5. Rangitata-Rakaia ALIL Piping + storage ? RDR + 20-90 Mm3 BCI New intake + distribution VIL 80 km piping RDR/TP/RS/OWL Connecting infrastructure Existing 250,000 + 30,000 ha MH +6 Mm3 Piping ?

  6. Pareora-Rangitata OWL Restructure RS 16.5 Mm3 + on-farm Existing 28,000 + 40,000 ha

  7. Waitaki-Pareora HDI +40,000 ha Existing 24,000

  8. Canterbury Summary • Irrigated area • Currently ~470,000 ha • New potential <245,000 ha + swap from g/w • Water storage • Currently 72 Mm3 (Active volume ~90 Mm3) plus significant on-farm storage • 22.5 Mm3 under construction • 100-200+ Mm3 p.a. potential from Lake Coleridge • New potential <480 Mm3 plus more on-farm • Supply/demand reliability to 95% • On-going efficiency improvements (distribution and on-farm)