NERC and ERCOT Rules: How They Are Made and How YOU Can Change Them. Kevin Thundiyil Associate Reliability Analyst March 23, 2005. Objectives. What’s happening to NERC’s good old planning and operating standards? How are NERC standards created?
E N D
NERC and ERCOT Rules: How They Are Made and How YOU Can Change Them Kevin Thundiyil Associate Reliability Analyst March 23, 2005
Objectives • What’s happening to NERC’s good old planning and operating standards? • How are NERC standards created? • What’s the connection between NERC policies and ERCOT’s Guides/Protocols? • How are ERCOT Guides/Protocols created?
What is Version 0? • Replacement to the current implementation of NERC Operating and Planning Standards • Part of NERC’s Functional Model concept • Effective April 1, 2005
How does Version 0 compare to current standards? • Same standards as before, just given a new name • Example: • CPS1 (P1T1 BAL-001-0) • UFLS System Maintenance (III.D.S1.M3 PRC-008-0) • Divided into fourteen categories • Given a three letter abbreviation
14 Categories • Resource and Demand Balancing (BAL) • Critical Infrastructure Protection (CIP) – Robinson • Communications (COM) • Emergency Preparedness and Operations (EOP) • Facilities Design, Connections and Maintenance (FAC) • Interchange Scheduling and Coordination (INT) • Interconnection Reliability Operations and Coordination (IRO) • Modeling, Data and Analysis (MOD) • Organization Certification (ORG) • Personnel Performance, Training, and Qualifications (PER) • Protection and Control (PRC) • Transmission Operations (TOP) • Transmission Planning (TPL) • Voltage and Reactive (VAR)
NERC Standards Making Processes • 11-step process • Comments are received at each major step • ANSI-certified, ensures a fair process • Accelerated process exists as well, “Urgent Action” • Cyber Security • Brief introduction…
Steps 1 through 4: SAR Development • A SAR or Standard Authorization Request is submitted to the Standard Process Manager • Submit public comments on SAR • Gather ballot pool and draft team members (important later on in the process) • Obtain authorization to draft a new standard
Steps 5 through 8: Standard Development • Standard Drafting Team will work with Requester to develop SAR into a standard • Public comments on draft – usually several rounds • Testing – optional • Analyze comments and test results, submit for a ballot
Steps 9 through 11: Standard Approval and Implementation • Standard submitted to Ballot Pool • If the ballot fails (requires a 2/3 majority), the process must start fresh with a new SAR • Standard forwarded to NERC Board for adoption • The NERC Compliance Enforcement Program will oversee its implementation and assess the effectiveness of the Reliability Standard
Examples • Cyber Security 1300 draft standard completed second round of public comments • Revised vegetation management draft standard just completed first round of comments, more expected – needs work
Adventures through the NERC Website • View standards under development: https://www.nerc.net/standards/ReliabilityStandards.aspx?tabindex=2&tabid=14 • Register* yourself or your organization (submit SARs, comments, draft team, ballot pools): https://www.nerc.net/standards/ReliabilityStandards.aspx?tabindex=6&tabid=27 *Not registration as an entity in the NERC Functional Model
NERC Standards and their Relationship to YOU • NERC passes a new standard • ERCOT or Market Participant creates OGRR or PRR based on NERC standard • Protocols and/or Operating Guides updated to agree with the new NERC standard • Examples: • Vegetation Management, ERCOT Guides 3.1.5.3.1 • Operator Training, ERCOT Guides 1.8.2
ERCOT Guides and Protocols Revision Process
ERCOT –Operating Guide Revision Request • Completed Operating Guide Revision Request (OGRR) form is sent to ogrevreq@ercot.com • Request posted to the Market Information System (MIS) • Comments regarding OGRR sent to ogrevreq@ercot.com • Operations Working Group (OWG) and Reliability Operations Subcommittee (ROS) review the OGRR and recommend action • ROS reviews comments and submits recommendation to Technical Advisory Committee (TAC) • PRS reviews consistency with ERCOT Protocols • TAC approves OGRR • TAC action reported to ERCOT Board
ERCOT – Protocol Revision Request • Protocol Revision Request (PRR) form sent to ProtRevReq@ercot.com • PRR posted to MIS • Comments submitted • Submitted to PRS (Protocol Revisions Subcommittee) twice • PRS Recommendation Report • Comments submitted • Protocol Impact Analysis (PIA) • Comments submitted • TAC recommendation and approval • ERCOT Board approval • Urgent Timeline exists as well: PRR reviewed by PRS, sent to TAC then to the ERCOT Board
Protocol Revision Timeline ERCOT Posts PRR 25-Day IA Period ERCOT Posts TAC Rec ERCOT Posts BOD Decision ERCOT Posts PRS Rec ERCOT Updates PRS Rec 30-Day IA Period X X X X X X X 21 Day Comment Period 21 Day Comment Period Dec 1 July 23 August 26 PRS Consideration 1st Consideration October 7 TAC Consideration November 16 BOD Consideration September 25 PRS Consideration 2nd Consideration Similar process applies to System Change Requests
Wrap-up • Version 0, the new face of NERC’s Operating and Planning Standards • NERC and ERCOT Standards process – driven by public comments, stakeholders • New NERC standards eventually filter down to ERCOT Guides/Protocols • Conclusion: NERC and ERCOT need your knowledge and experience to improve!!!