1 / 8

News

News. Richard Seto “forward calorimeter” meeting 9/04/2008. news. Suggested name FO rward CAL orimeter - FOCAL A NCC transverse spin physics team is set up – John Lajoie will lead it DC meeting – Oct 19 – but PLEASE get me simulations ASAP December – internal review of strategy

elewa
Download Presentation

News

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News Richard Seto “forward calorimeter” meeting 9/04/2008

  2. news • Suggested name • FOrward CALorimeter - FOCAL • A NCC transverse spin physics team is set up – John Lajoie will lead it • DC meeting – Oct 19 – but PLEASE get me simulations ASAP • December – internal review of strategy • Perhaps ~Jan – external review of strategy

  3. Selling EM1+EM2 • Trigger on and identify jet in FC (high EM signal) • Correlate to particles in central arm to get “ridge” • Triggering • Transverse physics

  4. pp Collisions (500GeV) (NEW) Rejection ~10,000 NCC LVL1 Trigger Rejection ET Threshold (GeV) EM cut : EHADR/(EEMC1+EEMC2+EHADR) < 0.25

  5. AuAu Collisions (NEW) NCC LVL1 Trigger Rejection NCC LVL1 Trigger Rejection NCC LVL1 Trigger Rejection NCC LVL1 Trigger Rejection NCC LVL1 Trigger Rejection ET Threshold (GeV) ET Threshold (GeV) ET Threshold (GeV) ET Threshold (GeV) ET Threshold (GeV) EM cut : EHADR/(EEMC1+EEMC2+EHADR) < 0.5

  6. AuAu Collisions(graduated ET threshold) (NEW) x1 x2 x3 NCC LVL1 Trigger Rejection h < 1.4 : ET 1.4< h <2.0: 2 x ET h > 2.0: 3 x ET Rejection ~30 ET Threshold (GeV) EM cut : EHADR/(EEMC1+EEMC2+EHADR) < 0.5

  7. DC meeting • Oct 19 • Present plausibility scenario • What I need • A design • Status and plans for test beam - Edouard • Resolution – Richard • tracking of pi0/gamma – Richard • Status of delta G • Long Range Correlation/Ridge physics – Ondrej – can we see EM part of high energy jet in AuAu

  8. Plausibility scenario

More Related