1 / 22

Company Profiles and Introduction

Company Profiles and Introduction. HAEDONG YEONGGWANG DOCKYARD CO., LTD. HAEDONG YEONGGWANG DOCKYARD CO., LTD. The Company's Mission. ■ Creating the Future ■ Innovation ■ Customer Confidence. ◆ Haedong Yeonggwang Dockyard CO., LTD. take over TK Shipyard on June 1, 2013.

elga
Download Presentation

Company Profiles and Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Company Profiles and Introduction HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  2. HAEDONG YEONGGWANG DOCKYARD CO., LTD. The Company's Mission ■ Creating the Future ■ Innovation ■ Customer Confidence ◆ HaedongYeonggwang Dockyard CO., LTD. take over TK Shipyard on June 1, 2013. ◆ Dockyard Address : 137, Gamami-ro, Hongnong-eup, Yeonggwang-gun, Jeollanam-do, Korea Tel : +82-61-356-9111-2 Fax : +82-61-356-1806 ◆ Head Office Address : 6th Fl., Haedong Bldg., 132, Hakgamdae-ro, Sasang-gu, Busan, Korea Tel : +82-51-324-1800 Fax : +82-51-312-2226 ◆ Homepage : www.hyd.co.kr E-mail : haedongcemco@daum.net 2 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  3. 1. CompanyProfile Aug. 27, 2007 Established TK Shipbuilding Co., Ltd. Oct. 25, 2007 Started to Construct Dry Dock. Jun. 03, 2009 Received the permit for usage of Dry Dock from YeonggwangProvincial Office. Jun. 09, 2010 Delivered Hull No. H0001. Oct. 01, 2010 Delivered Hull No. H0002. Completed the reclamation to the No. 2 & No.3 section. Nov. 08, 2011 Jun. 01, 2013 HaedongYeonggwang Dockyard CO., LTD. take over TK Shipyard. 3 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  4. 2. Vision and Strategy Management Goals Productivity World Competitive Medium-sized Dockyard on Cutting Edge Technology In Shipbuilding Vision • Simplify and Upstream production, Maximize Pre-outfitting • Grand Block Assembly, Minimize the Erroneous and • Corrective Rework • Advanced Shipbuilding Technology., Maximize turn over rate • On-Time supply of Materials • Maximize Productivity • Settle the Management System • Management with core ability Strategy Cost Productivity • Optimize Material Cost (Pre-Nesting, High Material Usage • and Recycling of Leftover Materials, etc.) • Optimize Labor Cost (Enhance Shipbuilding Tech.) • Elimination of the Waste Achieve Management Goals and Maximize Profits Quality Differentiated Shipbuilding Policy Delivery Cost • Achieve competitive Quality • Simplify and Upstream Policy Delivery Quality • Stabilization of Design and Production Work • Shorten the Building Period • On-Time Delivery 4 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  5. Minimize the Erroneous and Corrective Rework thru Optimal Design Optimize Material Cost Cost Saving Saving Labor Cost (Enhance the productivity by process improvement) Innovate Production Technology • 3. Vision and Strategy – Cont. Establishing the Core Production Infrastructure • Pre-Nesting, Maximize Usage of Steel Materials • Design Optimization • Establish Integrated Management System in design/material/production with ERP System • Grand Block Assembly • Maximize Pre-Outfitting • Module Unitfor Outfitting • Maximize Dock turn over rate Cost Saving 5 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  6. 4. Dockyard Location andLayout Location of TK Dockyard: 137,Gamami-ro, Hongnong-eup,Yeonggwang-gun, Jeollanam-do, Korea TK Dockyard TK Dockyard 6 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  7. 4. Dockyard Location andLayout-Cont. Dockyard Layout Completion of 1st construction stage Area : 148,676 m2 - Land Area : 60,122 m2 - surface of the water : 88,554 m2 Surface of the water LAND Area 7 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  8. 5. Major Production Facilities and Capability 8 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  9. 6. Breakdown of Facility Investment HAEDONG YEONGGWANG DOCKYARD CO., LTD. 9

  10. View of Dockyard(Feb. 22, 2010) 10 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  11. View of Dockyard(Apr. 16, 2010) 11 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  12. View of Dockyard(Jul. 10, 2010) 12 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  13. View of Dockyard(Aug. 20, 2010) 13 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  14. Launching Block 14 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  15. Launching Block 15 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  16. Launching Main Engine 16 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  17. Launching Deck House 17 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  18. Complete Construction of the Ship 18 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  19. Before Dock Out 19 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  20. Launching Deck House Lifting Deck House Approaching Floating Crane Locating Deck House Launching Deck House 20 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  21. Outfitting & Sea Trial 21 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

  22. Thank you! 22 HAEDONG YEONGGWANG DOCKYARD CO., LTD.

More Related