An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Height ModernizationMaking the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey Group Manager, Woolpert Inc

  2. Background – Surveying Infrastructure - Horizontal • NAD 27 – Best fit Spheroid for North America • Fifty nine years of terrestrial, local surveying by the general public • Line of sight required (Bilby towers) • Regional or large scale projects only conducted by National Geodetic Survey • Highest achievable relative accuracy was 1:100,000 • Network accuracy 10 m

  3. Background - Surveying Infrastucture (cont’d)

  4. Background – Surveying Infrastructure - Horizontal • NAD 83(86) – Best fit Global Ellipsoid, conventional observations along with satellite triangulation, Doppler positions, and VLBI • Incorporated satellite (non-GPS) observations into conventional data sets • Largest solution of simultaneously adjusted equations up until that time • 400,000 unknowns and 1,800,000 (observations) equations

  5. Background – Surveying Infrastructure - Horizontal • NAD 83(86) Issues • Not GPS-able • Poor accessibility • Irregularly spaced • Positional accuracy • Relative  1:100,000 • Network 1 m

  6. Surveying Infrastructure – Horizontal (cont’d) • Along came GPS • Private surveyors began finding issues with existing control • Large scale surveys no longer the domain of government surveyors • Projections and datums used • More ties to state plane coordinates • Both horizontal and vertical control in one operation • Overall horizontal accuracy improving

  7. Surveying Infrastructure in Indiana – HARNs • “GPSABLE” Clear Horizons for Satellite Signal Acquisition • EASY ACCESSIBILITY Few Special Vehicle or Property Entrance Requirements • REGULARLY SPACED Always within 20-100 Km • HIGH HORIZONTAL ACCURACY A-Order (5 mm + 1:10,000,000) B-Order (8mm + 1:1,000,000)

  8. Surveying Infrastructure in Indiana – Horizontal • Indiana HARN Phase I – 1997 (GPS1200) • Indiana HARN Phase II – 1998 (GPS1200) • Indiana HARN last of all 50 state HARN’s • No state HARN has better vertical component • NAD 83(97) Statewide Readjustment by NGS • ‘NAD 83’ no longer enough to define adjustment • Indiana HARN Phase III - 2003 (GPS1850) • FBN Vertical Enhancement Survey

  9. High Accuracy Reference Network Positional Accuracy • HARN Stations • Network (absolute): 0.1 m • Relative • B-order: one part per million • A-order: one part per 10 million • CORS Stations • 0.01 m

  10. Indiana HARN 1997/1998

  11. Phases of Indiana Surveying Infrastructure – Horizontal (cont’d) • HARN Participants: • HARN Phase I - Collaborative effort between federal government, local government, private contractors (The Schneider Corporation & Plumb-Tuckett) and various volunteers • HARN Phase II - Private contractor (Woolpert LLP) • HARN Phase III - federal government, local government and various volunteers. No private contractor.

  12. Indiana HARN Components: FBN/CBN • The Indiana HARN consists of stations maintained by the federal government and those maintained by the locals (anyone other than the federal government) • HARN – High Accuracy Reference Network (161 Total Points) • FBN – Federal Base Network (21), a subset of HARN stations sufficiently dense for the federal government to meet their surveying obligations within the state (100 km) • CBN – Cooperative Base Network (140), all other HARN stations, more densely spaced to meet local needs.

  13. Indiana HARN w/ FBN Stations

  14. 1991 GPS222 1996 1992 1996 1991 GPS1048 GPS341 1991 GPS197 1996 GPS805 reos 7/96 GP S291 1993 1994 reos-1996 GPS941 GPS1047 reobs 9/97 1996 GPS730 GPS606 1994 1995 1992 1995 GPS1121 1997 1997 GPS404 GPS887 1994 1991 GPS394 GPS882 GPS GPS260 GPS1178 1997 1997 1995 1993 1200 GPS633 1992 GPS908 1992 1993 GPS1150 GPS1179 GPS610 reos-6/95-GPS904 GPS412 GPS611 1995 GPS419 1992 1990 -GPS120 1997 GPS852 1993 GPS376 GPS1133 1993 1994 1992 GPS725 GPS366 GPS721 1992 GPS585 1990 1992 GPS383 reos 1/96 GPS936 -GPS170 GPS450 1993 GPS667 . GPS & CLASSICAL ADJUSTMENTS COMPLETED GPS ADJUSTMENT COMPLETED

  15. Horizontal Control Stations • A-order (13@1:10,000,000 horizontal) Adjusted to VLBI stations (NCMN 7291 Bloomington), CORS stations and other FBN stations • B-order (148@1:1,000,000 horizontal) Adjusted to A-order stations • C-order (all 1st, 2nd, and 3rd order stations) Rubber sheeted to A & B-order stations

  16. Indiana FBN Portion of the Indiana HARN

  17. Horizontal Adjustments • NAD 83(97) • adjusted horizontal coordinates in Indiana based on the first two HARN campaigns • adjustment based on NAD 83(CORS) which had been adjusted in 1996 • adjustment tied into surrounding readjustment • adjusted coordinates moved on the order of magnitude of ±1’ in Indiana • adjusted only satellite observations and rubber sheeted conventional control into HARN stations

  18. Horizontal Adjustments • NAD 83(NSRS2007) • NSRS - National Spatial Reference System • readjustment of all GPS data in the National Spatial Reference System simultaneously, not just a state or regional readjustment • adjustment tied to CORS network as of 2002 • adjusted data in Indiana to be available Spring 2007 • states on stable North American plates will not be given an epoch date (considered fixed)

  19. NAD 83(NSRS2007)

  20. Phases of Surveying Infrastructure – Vertical • NGVD 29 – National Geodetic Vertical Datum of 1929 (sea level) • Thousands and thousands of km of level loops run since 1929 • NAVD 88 – North American Vertical Datum of 1988 • Many monuments have move or been destroyed over the years

  21. Phases of Indiana Surveying Infrastructure – Orthophotography & DEM • Statewide Digital Color Orthophotography – 2005 • Statewide Color Infrared Aerial Photos – 2005 • Statewide Digital Elevation Model – 2005 • Statewide Digital Surface Model – 2005 • gis.iu.edu • Google Earth

  22. What’s Next – Height Modernization • Height Modernization is any program aimed at improving elevation estimates • Typical activities have included: • differential leveling establishing/re-establishing elevations on horizontal control stations • survey mark recovery and remonumentation • GPS surveying establishing horizontal positions and ellipsoidal heights on bench marks • Gravity data observations for inclusion in the national geoid model

  23. Height Modernization in Indiana • Supplements the HARN and INDOT CORs • To be done in phases • Phase I – differential leveling • By INDOT District starting in Vincennes District • Phase II – GPS observations on additional bench marks

  24. Height Modernization in Indiana – Phase I (Vincennes)

  25. Height Modernization in Indiana – Phase I •  125 miles of leveling in Vincennes District • $1,500/mile • $190,000 for Vincennes District • Extrapolating to entire state •  $1,140,000 • Funding for OISGA • $60,000 • Total for Phase I - $1.2M

  26. Height Modernization in Indiana – Phase I Activities • Virtual Mark Recovery • Actual Mark Recovery • Coordination with INDOT CORS • Planning and Route Selection • Differential Leveling • Adjustment and Report

  27. Height Modernization in Indiana • Questions?