1 / 10

L eaders in I mplementing F easible E nergy SYSTEMS

L eaders in I mplementing F easible E nergy SYSTEMS. AeroShade TM. Project Manager : Mindy Sanchez Lead Design : Stephen Arlington Market Executive : Joe Munchel Research Development : Lindsay Master. LIFE is bringing you green wind energy. Problem Statement.

eli
Download Presentation

L eaders in I mplementing F easible E nergy SYSTEMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LeadersinImplementingFeasibleEnergy SYSTEMS AeroShadeTM Project Manager: Mindy Sanchez Lead Design: Stephen Arlington Market Executive: Joe Munchel Research Development: Lindsay Master LIFE is bringing you green wind energy.

  2. Problem Statement • The goal of our team is to build and develop an architecturally appealing integrated wind system that can be either retrofitted to existing buildings or added to new buildings. • This product will also utilize and incorporate existing C/S products and customer base.

  3. Research • HAWT (Horizontal Axis Wind Turbine) • VAWT (Vertical Axis Wind Turbine) -Savonius -Giromill -Darrieus • Wind Belt

  4. Genzyme Science Center • Framingham, MA • 230,000-square-foot • Worcester, MA: • Average yearly wind speed: 10.9 mph

  5. Mechanics of the AeroShadeTM

  6. Advantages of the AeroShadeTM • Easily retrofitted • Aesthetically pleasing and discrete • Uses Construction Specialties product • CS Sun Control blades • Customizability • Substitute turbines with sun control blades

  7. Results BEFORE AFTER

  8. Return on Investment AeroShadeTM Cost Calculator • Uses Input Variables • Cost per kWh • Wind speed • Number of Floors • Building Area • Sections of Aeroshade per Floor • Years Installed • Produces Cost/Output Results • Output per Installment • % Energy Reduction • Energy Savings per Year • Years to Payoff Initial Costs • Profit/Deficit after X years • Genzyme Science Center • $ .177 • 5 m/s • 6 Floors • 230,000 sqft • 175 Sections • After 20 Years… • Return On Investment • 90,300 kWh per Year • 3.93% Reduction • $15,985 • 9.59 years • $166,400 Profit

  9. References • http://www.greenlivingtips.com/articles/65/1/How-wind-turbines-work.html • http://www.windturbine-analysis.netfirms.com/ • http://www.symscape.com/blog/vertical_axis_wind_turbine • http://www.awea.org/faq/vawt.html • http://www.ecologic-power.com/wind/vertical-axis-turbine.php • http://www.urbangreenenergy.com/turbine.php?id=4 • http://www.reuk.co.uk/Windbelt-Cheap-Micro-Wind-Generator.htm • http://lwf.ncdc.noaa.gov/oa/climate/online/ccd/avgwind.html • http://www.genzyme.com

  10. Acknowledgements • Construction Specialties • John Klinger Thank you for the opportunity to work on this Design Project.

More Related