1 / 17

Objective 1.1: The Network of the Future

Objective 1.1: The Network of the Future. FP7 ICT Call 4 STREP Briefing. Rainer Zimmermann Head of Unit ‘Future Networks’ European Commission DG Information Society and Media. Outline. Work Programme 2009/2010 Overview Objective 1.1 in Call 4 Proposal Strategies. Where do we stand?.

elia
Download Presentation

Objective 1.1: The Network of the Future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective 1.1: The Network of the Future FP7 ICT Call 4 STREP Briefing Rainer Zimmermann Head of Unit ‘Future Networks’ European Commission DG Information Society and Media

  2. Outline Work Programme 2009/2010 Overview Objective 1.1 in Call 4 Proposal Strategies

  3. Where do we stand? Launched: FP7 ICT Call 1for proposals in 2007-08 ~200 M€ of EU funding, 46 projects funded Out of 173 proposals received Ahead of us WP 2009-10 Objective 1.1: ~190 M€ funding Call 4 ~110 M€ funding Call 5 ~80 M€ funding ••• 3

  4. Funding schemes in Objective 1.1 Collaborative projects (CP): STREP: 'small or medium-scale focused research actions‘ IP: 'large-scale integrating projects' (IP) Network of Excellence (NoE) Coordination and Support Action (CSA) Objective is to support a balanced portfolio: Focused and agile scientific and technological exploration through STREP’s Concentration of efforts - where needed - through IP’s Support Actions and NoE’s: only in call 5 Budget per call per instrument in Objective 1.1:

  5. Outline Work Programme 2009/2010 Overview Objective 1.1 in Call 4 Consortium Strategies

  6. Objective 1.1 The Network of the Future • Future Internet Architectures and Network Technologies • Novel Internet architectures and technologies • Flexible and cognitive network management and operation frameworks • Spectrum-efficient radio access to Future Networks • Next-generation mobile radio technologies • Cognitive radio and network technologies • Novel radio network architectures • Converged infrastructures in support of Future Networks • Ultra high capacity optical transport/access networks • Converged service capability across heterogeneous access

  7. Objective 1.1 The Network of the FutureExpected Impact • Strengthened positioning of European industry in the field of Future Internet technologies • Reinforced European leadership in mobile and wireless broadband systems, optical networks, cognitive network management technologies. • Increased economic efficiency of access/transport infrastructures (cost/bit) • Global standards and European IPRs reflecting federated and coherent roadmaps. • Wider market opportunities from new classes of applications taking advantage of convergence. • Accelerated uptake of the next generation of network and service infrastructures.

  8. INFSO.D1 Staff R.ZIMMERMANN Z.RIDEG (Head of Unit Secretary) A. HOUGHTON Deputy Head of Unit H. PALASHEVA (Deputy Head of Unit Secretary) Head of Unit M. AHLBERG R. BAYOU T. BOULANGE P. BURCEAG J. CARVALHO P. CHASTANET P. CIUDIN M. DE BECKER P. DE SOUSA A. GARCIA P. JAUHIAINEN L.KERKOUR M. MONTARELO P. STUCKMANN F. TAGLIANI

  9. Some Logistics Peter Stuckmann Objective 1.1 Coordinator Project Officer ‘Future Networks’ European Commission DG Information Society and Media FP7 ICT Call 4 STREP Briefing ••• 9

  10. Evaluation Operation Figures 143 Eligible Proposals: 119 STREPs, 24 IPs Total grant requested: ~569M€ (budget: 110M€) STREP grant requested: ~ 362M€ (budget: 33-55M€) IP grant requested: ~ 207M€ (budget: 55-77M€) 105 Experts STREP panel: 56 Evaluators + 10 Recorders IP panel: 33 Evaluators + 6 Recorders

  11. Tasks for this week 119 STREP proposals CR+PM Individual Assessment Consensus Panel approval Panel reports including: Final ESR PM (recording panel decision) IARs + Draft CR Back to CM

  12. Handling of the documentation You should have brought with you the proposal documents sent to you by DHL. After the briefing, you can pick up a box at the secretariat, with your name on, containing the detailed planning, 2 booklets with proposal summaries and other documents Before leaving the building (at lunch or in the evening) give your box back to the secretariat When you pick up the box in the morning and after lunch and SIGN THE ATTENDANCE LIST at this time (presence need to be justified twice a day, AM and PM). At the end of the week (before you leave), you must hand back ALL documents and sign a form.

  13. COVENT GARDEN building: PC and Network facilities PCs are available in the meeting rooms and in the “reading” areas They are connected to an internal network with access to RIvET (all) and Pinocchio (Recorders and Commission only). General login/password will be indicated near the PCs Recorders receive their own login/password for the network and to access Pinocchio (also included in the documentation box you will receive today) The use of Laptops, USB sticks, mobiles and other computing and communication devices is NOT ALLOWED in the building.

  14. Interacting with your colleagues The discussion about individual proposals takes place only at the Consensus meeting and the Panel meetings (not in the reading room or corridors, not outside the building).

  15. Consensus Meeting Room Equipment 2 PCs Access to RIvET and Pinocchio Access to the rapporteur’s folder in the network 1 Beamer To show the draft CR or merged IERs Useful at the time of joint editing of agreed comments and remarks A printer

  16. Role of the Recorder (Rapporteur) Before the meeting: preparation of a draft CR (MS Word = working document) Does not to take side for a particular opinion Presentation of the comments in a more structured way to facilitate the discussion (by bullet for each criterion) At the meeting: record the outcome (in MS Word) in the CR and PM (proposal minutes) NB the rapporteurs do NOT chair or moderate the consensus meeting- that is the role of the EC PO! After the meeting Transfer MS Word -> NotePad -> PINOCCHIO Complete the Ethical Issues report if needed (only for proposals above all thresholds) Verify correct formulation and spelling in the CR

  17. Consensus Meetings scheduled at 11:00 Go to the Commission Secretariat: A2 1/10, pick up your box, sign the attendance sheet and go to the meeting room: COSMOS: Rm 1/163 (EC mod: Jorge Carvalho) DAPHNE: Rm 1/141 (EC mod: Paulo De Sousa) HELP: Rm 1/128 (EC mod: Remy Bayou) SACRA: Rm 1/127 (EC mod: Petru Ciudin) EPICURUS: Rm 1/119 (EC mod: Bart v. Caeneghem) METABAS: Rm 1/120 (EC mod: Pertti Jauhiainen) ICARON: Rm 1/105 (EC mod: Pierre Chastanet) Stay in the room if you are not concerned

More Related