An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005

  2. Material on this page is consider Non-Internet Public (NIP) You would like a copy of this slide, please contact: Public Reference RoomTelephone: 202-502-8371Toll-free 1-866-208-3676Email: public.referenceroom@ferc.gov

  3. Item No. C- 3 List of Public Meetings. • June 3, 2004:  Scoping Meeting (Providence) • June 4, 2004:  Publically-attended Site Inspection (KeySpan Facility) • July 7, 2004:  Scoping Meeting (Providence; Fields Point Area) • July 8, 2004:  Scoping Meeting (Middletown) • January 11, 2005:  DEIS Comment Meeting (Providence; Fields Point Area) • January 12, 2005:  DEIS Comment Meeting (Middletown)

  4. Item No. C- 3 KeySpan LNG, L.P. • 50 LNG tankers per year • 375,000 Mcf per day into Algonquin’s proposed facilities • up to 150,000 Mcf per day of vaporized LNG to New England Gas • 20,000 Mcf per day from its truck loading

  5. Item No. C- 3 KeySpan LNG, L.P.Current Federal Safety Standards Not Met • LNG storage tank impoundment designed to 100 percent of the tank contents rather than 110 percent; • thermal radiation & flammable vapor exclusion zones extend offsite onto adjacent properties; • evaluation by a seismic consultant required to determine existing tank compliance with the 2001 edition of the NFPA, which increased the stringency and complexity of the seismic requirements.