1 / 19

Lahore Garment City Project A Project of the Ministry of Textile Industry, Government of Pakistan

Cat-A Building. Cat-B Building. Lahore Garment City Project A Project of the Ministry of Textile Industry, Government of Pakistan. Cat-C Building. Located at: Sundar Industrial Estate, Raiwind , Lahore.

eliza
Download Presentation

Lahore Garment City Project A Project of the Ministry of Textile Industry, Government of Pakistan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cat-A Building Cat-B Building Lahore Garment City ProjectA Project of the Ministry of Textile Industry, Government of Pakistan Cat-C Building Located at: Sundar Industrial Estate, Raiwind, Lahore Office Address: 132-P, Gulberg-II, Lahore Tel: 35870657-9 Fax: 35872087 Email: info@ lgcc.org.pk Web: www.lgcc.org.pk

  2. Introduction • Phase-I of the project comprises of the following buildings:- • Category A building =Basement plus five stories. • Category B building =Basement plus four stories. • Category C building =Basement plus four stories • Administration Block and Auditorium. • The main factory buildings i.e. Category A and B buildings have been completed which would be leased out to the Garment Manufacturers as per Leasing Policy finalized and approved by the Board of Directors of the Company. Work on Category-C building is in progress and is expected to be completed in May, 2012. On completion, this building will also be leased out. • In order to ensure transparency, the premises shall be leased out on the basis of open competitive bidding on per square foot basis. • The Government of Pakistan, in the Trade Policy 2003-04, had announced setting up of three Garment Cities in Karachi, Lahore and Faisalabad. • The underlying objective of the project is to reduce the capital outlay of Garment Manufacturers and provide them with a built up space, fully compliant and equipped with state of the art facilities where they can establish their units by avoiding the lengthy process of buying land and then constructing factories thereon. • The Lahore Garment City Company was registered under section 42 of Companies Ordinance, 1984 with Registrar Joint Stock Companies, City District Government Lahore. The Federal Board of Revenue has exempted its income from income tax under sub clause (3) of clause 58 of Income Tax Rules, 2002.

  3. Category-A Building Basement + 5 stories Total Rentable Area 1,70,294 sq.ft.

  4. Category-A Building - Basement

  5. Category-A Building – Ground Floor

  6. Category-A Building – First Floor

  7. Category-A Building – Second Floor

  8. Category-A Building – Third Floor

  9. Category-A Building – Fourth Floor

  10. Category-B Building Basement + 4 stories Total Rentable Area 66,150 sq.ft.

  11. Category-B Building - Basement

  12. Category-B Building – Ground Floor

  13. Category-B Building – First Floor

  14. Category-B Building – Second Floor

  15. Category-B Building – Third Floor

  16. Category-C Building Basement + 4 stories Total Rentable Area 30,615 sq.ft.

  17. Category-C Building – Ground Floor

  18. Category-C Building – First Floor

  19. Facilities Available • Built in facility of reception area and Entrance Room. • Separate Electrical Installation for each Floor. • Cable Tray in Industrial Hall fixed with Industrial Electric Sockets. • Well ventilated and Natural Lighting. • Provision of ducts for fixing Chillers/Air Conditioning System. • Fixed with basic Fire Fighting and Fire Alarm System. • Wiring for CCTV Cameras and Smoke Detectors. • Sufficient parking space in open area. • Facility of Cargo and Passenger Elevators in progress.

More Related