RPF Laboratory Accreditation/Verification Task Group

RPF Laboratory Accreditation/Verification Task Group. Feedback from meetings of 12 April 2002. RPF Resolution. That inter-laboratory testing be conducted on an ongoing basis under the guidance of a task group to be convened by the Asphalt Academy. Task Group Members. Role of Task Group.

eliza
Download Presentation

RPF Laboratory Accreditation/Verification Task Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPF Laboratory Accreditation/Verification Task Group Feedback from meetings of 12 April 2002

  2. RPF Resolution That inter-laboratory testing be conducted on an ongoing basis under the guidance of a task group to be convened by the Asphalt Academy

  3. Task Group Members

  4. Role of Task Group • To coordinate the accreditation, verification and proficiency activities of materials testing laboratories with the ultimate aim of improving confidence levels in test results emanating from the laboratories

  5. SANAS • Responsible for managing the accreditation process • Specialised Technical Committee (STC) for Civil Engineering Laboratories established • Problems in the road sector: • Upgraded test methods not yet available • No direct linkage to road sector for technical input and assessors • Accreditation of site labs especially those not linked to permanent labs • Feedback of activities at next RPF

  6. Actions from the meeting • Finalise the upgrading of the test method for roads (mainly TMH 1) • SAACEL to provide comments on test method before end of April • Validation of test methods – B Dumas to report to next meeting • Set up proficiency scheme driven by the Task Group • Identify ways of ensuring test equipment/apparatus is consistent and correctly calibrated

  7. Proficiency Scheme Actions Establish a sub-committee to investigate appropriate proficiency schemes; Create a prioritisation framework for test methods required to undergo proficiency testing; Prioritise test methods for proficiency testing; Develop Guidelines on proficiency scheme for the road sector; Identify potential service providers to manage the scheme; Identify and motivate funding to implement the scheme

  8. Feedback from the Materials Testing Committee meeting of 23 April 2002