Optimal Trajectory Design. Xiaoli Bai Postdoctoral Research Associate Email:xiaolibai@tamu.edu (office)979-8624992 752 Bright Building. OUTLINE. Fundamentals of optimal control After you solve the optimal control problem for one case, how to do the mission design?
E N D
Optimal Trajectory Design Xiaoli Bai Postdoctoral Research Associate Email:xiaolibai@tamu.edu (office)979-8624992 752 Bright Building
OUTLINE • Fundamentals of optimal control • After you solve the optimal control problem for one case, how to do the mission design? • Mission design study in 2008 • Mission design study in 2009 • A recent design option: low-thrust • Look at a hybrid approach
Fundamentals of optimal control Cost function: Dynamical equations: Boundary conditions: Other constraints on the states and control
through optimality condition: (Indirect Approach) Boundary conditions Unknown variables: Pontryagin’s principle Introduce costates and Lagragian multipliers
Indirect Approach: an Chebyshev pseudospectral method Transform to a nonlinear programming problem
Fundamentals you need to have to • Optimal control theory: AERO 623: SPACECRAFT MANEUVERS by Dr. Vadali is very worthwhile! • Some numerical tool -MATLAB: [x,fval,exitflag,output,lambda,grad,hessian]= fmincon(fun,x0,A,b,Aeq,beq,lb,ub,nonlcon,options) -SNOPT -A self-developed tool will benefit you a lot!
Design in 2008 Contour of C3: Km2/s2
Favorite Launch Window ( <2km/s) • 2011-10-21 to 2011-12-3: maybe more pressure on the current development • 2012-04-13 to 2012-04-30:smallest total delta-v • 2012-12-20 to 2013-01-20: rendezvous delta-v 1.9km/s-1.7km/s; shortest flight time(103-126days) • 2013-04-04 to 2013-05-26: rendezvous delta-v 1.9km/s-0.64km/s; although may put more pressure on the mitigation. (193-337days)
Design in 2009 Trajectory Design • We looked at launch opportunities from 2020-2028; • Ideal launch opportunity occurs Feb-10-2021 to March-3-2021 • We also looked at alternate launch opportunities Sep-14-2021 Feb-19-2021
Launch opportunities from 2020 to 2028; max C3: 50km^2/s^2
Launch opportunities from 2020 to 2028 max Vf: 10km/s
Cruise Phase Sep-14-2021 TOF:208days; C3:4.3km^2/s^2; Vf:3km/s Feb-19-2021
A new approach: Low thrust propulsion Deep Space 1 Dawn Organization: NASA Major contractors Orbital Sciences, JPL, UCLA Mission type Flyby/Orbiter Satellite of Mars (flyby) Vesta then Ceres Launch date: September 27, 2007, Launch vehicle: Delta 7925H Mission duration:8 years Mass:1,250 kg (2,756 lb) xenonion thrusters Isp=3100s, T=90mN Total delta-v: 10km/s Dawn is NASA’s first purely exploratory mission to use ion propulsion engines Organization: NASA Mission type Testing of technologies, Flyby Satellite: of Sun. flew by Braille and Comet Borrelly Launch date October 24, 1998 Launch vehicle Delta II rocket Mission duration: ended 13 December2001 NSTAR ion thruster Isp:1000-2000s, 92mN at max Power fired for 678 total days No interference was found with other spacecraft systems, such as radio communications or the science instruments
Hybrid Impulsive and Low Thrust Optimal Control • Optimization Goal: minimize the total impulse energy by designing • thrust angles!
Initial Impulse Contour of V1(km/s) using hybrid Contour of V1(km/s) using Lambert • For a launch vehicle C3(V1^2) less than 18km/s^2, the launch window for an Apophis mission spans a full year.
Rendezvous Impulse Contour of V2(km/s) using hybrid Contour of V2(km/s) using Lambert • The pork chop plot patterns remain similar, whereas the hybrid approach requires much less impulse.