1 / 6

Dust Accelerator: Status and Plans

Dust Accelerator: Status and Plans. 3 MeV dust accelerator Particle sizes: 0.2 – 2.5  m Particle velocities: < 100 km/s Large test chamber UV sources Solar wind simulator Various targets Small (UHV) test chamber Microphysics diagnostics Additional 20 kV ‘mini’ accelerator

ellery
Download Presentation

Dust Accelerator: Status and Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dust Accelerator: Status and Plans • 3 MeV dust accelerator • Particle sizes: 0.2 – 2.5 m • Particle velocities: < 100 km/s • Large test chamber • UV sources • Solar wind simulator • Various targets • Small (UHV) test chamber • Microphysics diagnostics • Additional 20 kV ‘mini’ accelerator • Prototype dust head, detectors, etc.

  2. Pelletron in NPL • Designed after Heidelberg facility • HV chamber • Dust head • Beam lines • Particle selection units • Located in NPL on East Campus (Physics) • Previous use : CU cyclotron • 90’ x 56’ high bay (shared) • 50 ton crane • Lots of power and shielding • 12 offices + lab/sample-prep areas

  3. Pelletron in NPL high bay

  4. Pelletron in NPL high bay

  5. NPL Second Floor

  6. Near-Term Items • NPL Renovation / Re-inhabitation • Clear / Paint offices • Clear high-bay space • Bring power/water/air to Pelletron area • FacMan supplied $50k of ICR funds for project • Pelletron order • 12-month lead time until delivery • Chamber / vacuum sys. / cooling / beamlines / detectors / PSU / etc. can be completed during interim • Complete fabrication of 20 kV mini-accelerator

More Related