CREZ Optimization Studies Scenario 2

CREZ Optimization Studies Scenario 2. Jeff Billo RPG CREZ meeting 02-15-2008. Description. This solution creates two new 345-kV wind generation transmission systems which are separate from the existing system in west Texas One 345-kV loop for delivering Panhandle wind

elliot
Download Presentation

CREZ Optimization Studies Scenario 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CREZ Optimization StudiesScenario 2 Jeff Billo RPG CREZ meeting 02-15-2008

  2. Description • This solution creates two new 345-kV wind generation transmission systems which are separate from the existing system in west Texas • One 345-kV loop for delivering Panhandle wind • One 345-kV network for delivering Central and McCamey wind • Move some existing plants to new system by reconfiguring existing switch stations • Connection to the existing system only in eastern part of state RPG CREZ Meeting 02-15-2008

  3. Goals • Find the least cost plan • Reduce loading on existing major paths RPG CREZ Meeting 02-15-2008

  4. What It Looks Like • Overall wind curtailment is 1.7% RPG CREZ Meeting 02-15-2008

  5. RPG CREZ Meeting 02-15-2008 RPG CREZ Meeting 02-15-2008

  6. The Tally Panhandle Loop and Associated Projects • 563 miles new 345-kV double circuit lines • 156 miles new 345-kV single circuit lines • 23 miles rebuilding existing 345-kV line • 197 miles adding second 345-kV circuit to existing structures • Series compensation on 2 345-kV circuits RPG CREZ Meeting 02-15-2008

  7. The Tally Central and McCamey Associated Projects • 809 miles new 345-kV double circuit lines • 200 miles new 345-kV single circuit lines • 236 miles adding second 345-kV circuit to existing structures • Series compensation on 5 345-kV circuits • 7 345/138-kV autotransformers • 19 miles new 138-kV single circuit line RPG CREZ Meeting 02-15-2008

  8. The Tally Existing System Projects • Lamesa area rebuild (similar, but not the same as in the Five-Year Plan) • Loop Zorn-Austrop into Lytton Springs • Add second 345/138-kV auto at Whitney* • Add third 345/138-kV auto at Cagnon • Verde Creek-Bandera 138-kV line upgrade • Seguin-McQueeny 138-kV line upgrade • Ferguson-Wirtz 138-kV line terminal equipment upgrade • Big Spring-Chalk 138/69-kV upgrade • Big Spring-Midland East 138-kV line upgrade • Abilene South-Leon 138-kV line upgrade • Oklaunion-Bowman 345-kV line* • Add second 345/138-kV auto at Eagle Mountain • Eagle Mountain-Alliance-Roanoke 345-kV line terminal equipment upgrade * Identified in 2007 Five-Year Plan RPG CREZ Meeting 02-15-2008

  9. Comments Please direct comments to Warren Lasher Warren: wlasher@ercot.com 512-248-6379 RPG CREZ Meeting 02-15-2008