An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Benoît Esnault (CRE) 17th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms

  2. Introduction • Context: need to improve the access to cross border points • Different allocation rules on the two sides of borders • Different types of capacity products • Domination of First Come First Served • More integration to the benefit of competition and security of supply • Preparation of the implementation of the third package: pilot framework guideline • CAM selected for the pilot project at the 16th Madrid Forum • Letter from the Commission received on September 22, 2009 • Consultation on the draft framework guideline launched on December 18, 2009 • Final version expected by end of March 2010 • ERGEG principles on CAM & CMP published in January 2009 & public consultation provided the basis for the pilot framework guideline

  3. From the toolbox approach to a long term target model • ERGEG principles were based on a “toolbox approach” • Have enough flexibility to address the variety of situation in Europe • Several tools were proposed to cope with identified issues • Stakeholders requested to be more prescriptive • Developing framework guidelines/codes advocate for identifying “preferred options” • Development of a “target model” • Agreed long term vision for the EU gas market • Cohabitation of interconnected entry-exit systems with a notional hub • Ambition: concentrate trades at hubs to the benefit of market liquidity • Need for a progressive and pragmatic implementation • Various situations in Europe to be taken into account • Interim steps related to market maturity, transit, tariffs, etc.  Keeping some flexibility is necessary to deal with complexity and potential unexpected outcomes of proposals

  4. Target model and how to reach it • Scope of the Framework guideline: interconnection points between entry-exit zones within the EU ( ) • General principles • All market areas organized as entry-exit zones with virtual hubs • FCFS forbidden if congestion • Limited number of capacity products • Coordinated allocations throughout the EU • Auctions as preferred CAM; pro-rata allowed if conditions are not met for efficient & fair auction procedures • Towards uniform capacity allocation procedures at interconnection points throughout Europe in 2 steps: • Harmonisation of procedures at every IP: towards bundled products between market areas • Harmonisation at the EU level: same products & CAM everywhere

  5. Framework guideline proposals (1/3) • TSO cooperation • Harmonisation of capacity products and allocation • Capacity calculation and maximisation • Communication procedures • Existing contracts • Where needed, amendment of existing capacity contracts and/or relevant clauses of general terms and conditions where needed • Definition of capacity products • Objective: make access to capacity more simple • Small number of products of various durations, from short term to multi-annual • A minimum share of capacity shall be sold as short term products • Firm and interruptible products

  6. Framework guideline proposals (2/3) • Harmonisation of products • Products should be the same all over Europe • Interruptible capacity definition and calculation have to be harmonised • Interruptions should take place in a coordinated manner • Capacity offered • All the non previously allocated capacity, capacity surrendered by shippers and UIOLI capacity • Long term bookings not affected • Bundled products • Capacity at interconnection points to be sold via bundled products • Interim step: “combined entry-exit products”, based on TSO cooperation • One contractual interconnection point out of several physical interconnection points connecting the same entry-exit zones

  7. Framework guideline proposals (3/3) • Capacity allocation procedures • If no congestion, capacity is allocated as requested by shippers • Auction as standard allocation methodology • Pro-rata as interim step when necessary • Priority: having the same CAM on the two sides of interconnection points • Expert group meetings: auctions preferred by a majority but pro-rata considered useful • Preference for only having 1 allocation mechanism • But need to be pragmatic: pro-rata may be adapted under certain conditions • FCFS to be banned • except perhaps for intraday capacity allocations • Regular and timely coordinated allocation for all the interconnection points • Booking platforms

  8. Public consultation and next steps • ERGEG public consultation on the pilot framework guideline • From 18 December 2009 to 26 February 2010 • Workshop to be held in Brussels on 2 February 2010 • Main questions • Existing contracts • Adaptation of price? • Incentives to dominant shippers to surrender some capacity? • Should legacy contracts be questioned with regard to capacity allocation? • Auctions versus pro-rata: shared views among stakeholders • Bundled products: how to implement them? • Role of secondary markets? • Way forward • Finalisation of the framework guideline in March 2010 using the results of the public consultation

  9. Thank You!