1 / 6

Fletton Parkway Widening A1139 J17 – J2

Fletton Parkway Widening A1139 J17 – J2. Andy Tatt Peterborough City Council Transport and Engineering Group Manager John Holland Associate URS Infrastructure and Environment UK Ltd Scheme Project Manager. History Proposed Scheme Funding Procurement Programme. Scope

elmo-perry
Download Presentation

Fletton Parkway Widening A1139 J17 – J2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fletton Parkway Widening A1139 J17 – J2

  2. Andy Tatt Peterborough City Council Transport and Engineering Group Manager John Holland Associate URS Infrastructure and Environment UK Ltd Scheme Project Manager

  3. History Proposed Scheme Funding Procurement Programme

  4. Scope Widening of the section between Junctions 1 and 2; Complete reconstruction of the eastbound carriageway between Junctions 1 and 2; Introduction of a ‘type C’ merge where the A1(M) link road joins Fletton Parkway; Link capacity improvements between junctions 17 and 2; Replacement Street Lighting between junctions 17 and 2 Resurfacing of road as necessary between junctions 17 and 2 Replacement of signage and lining as required; Installation of Average Speed Cameras to enforce a (60mph) speed limit in between J17 of the A1(M) (including the eastbound slip) and junction J3 of the Fletton Parkway. Installation of Closed Circuit Television Cameras (CCTV); Installation of maintenance bays as required.

  5. URS APPROACH Delivery Risks Current Activities

  6. QUESTIONS

More Related