50 likes | 145 Views
Fort Nelson Progress Pictures Week 13. Installed starters to wall foundation from GLs C6 – C8, poured column bases C6 – C8. Fort Nelson Progress Pictures. Constructed kickers for radius wall, installed starters to tapered wall, prefabricated the remaining column base steel.
E N D
Fort Nelson Progress Pictures Week 13 • Installed starters to wall foundation from GLs C6 – C8, poured column bases C6 – C8
Fort Nelson Progress Pictures Constructed kickers for radius wall, installed starters to tapered wall, prefabricated the remaining column base steel.
Fort Nelson Progress Pictures • Installed edge protection scaffold to gas meter house to allow roof to be finished and temporary water proofed. Completed excavation of footing next to GL C5 and blinded.
Fort Nelson Progress Pictures Commenced excavating bank back in the lower gallery. Started to back fill with sand and install cordec to the beams above the Victorian water tank.