Fort Nelson Progress Pictures Week 13. Installed starters to wall foundation from GLs C6 – C8, poured column bases C6 – C8. Fort Nelson Progress Pictures. Constructed kickers for radius wall, installed starters to tapered wall, prefabricated the remaining column base steel.

elom
Download Presentation

Fort Nelson Progress Pictures Week 13

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fort Nelson Progress Pictures Week 13 • Installed starters to wall foundation from GLs C6 – C8, poured column bases C6 – C8

  2. Fort Nelson Progress Pictures Constructed kickers for radius wall, installed starters to tapered wall, prefabricated the remaining column base steel.

  3. Fort Nelson Progress Pictures • Installed edge protection scaffold to gas meter house to allow roof to be finished and temporary water proofed. Completed excavation of footing next to GL C5 and blinded.

  4. Fort Nelson Progress Pictures Commenced excavating bank back in the lower gallery. Started to back fill with sand and install cordec to the beams above the Victorian water tank.